East Dundee right of way bonds.
From $100. Enter your amount.

Before constructing, installing, or altering a utility facility — water, sewer, gas, electric, or telecommunications lines and similar infrastructure — within a public right of way in the Village of East Dundee, Village Code § 54.04 requires a permit, and § 54.10 conditions it on posting security. Premiums cost 1% of the bond amount, $100 minimum. The application collects no credit information, and most applications approve instantly.

Required under Village Code § 54.04 before a utility facility permit is issued for work in the right of way
Backs restoration of the right of way after utility facility construction, repair, or removal
From $100, no credit section in the application — enter your required bond amount and see your price at application
From $1001% of the bond amount, $100 minimumA-ratedA.M. Best carriersFastinstant underwriting for most
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

Right-of-way bonds are short, standard-form permit filings. Enter your amount, pay, and file with the Village. Here is the whole thing:

TODAY · ONLINE

Apply online

Your details, the scope of the right-of-way work, the bond amount your permit requires, and the effective date — that is the entire application.

USUALLY MINUTES

Approved

The application collects no credit information, and most applications approve instantly. If a check ever runs on a larger amount, it is a soft pull that will not touch your score.

SAME DAY

File with the Village

Your executed bond arrives by email, ready to attach to your right-of-way permit application. Wet-ink originals mailed on request.

About this bond

What it is and who needs it.

What the right of way bond actually guarantees

East Dundee's Village Code Chapter 54 governs the construction of utility facilities — water, sewer, gas, electric, and telecommunications lines and similar infrastructure — within a public right of way. Section 54.04 requires a permit before that work begins, and § 54.10 conditions the permit on posting a security fund that backs the promise to restore the right of way and comply with the permit's terms.

It is a three-party arrangement: you (the principal), the surety carrier, and the Village of East Dundee (the obligee), with the Village's streets, sidewalks, and utilities as the protected interest. If the right of way is left damaged or the permit conditions are not met, the Village can draw on the bond, and you repay the surety — it is not insurance for you.

There is no single citywide amount — the amount is set on your permit to match the scope of the work. Enter the figure shown on your right-of-way permit; we price the bond at 1% of that amount, $100 minimum.

East Dundee Code of Ordinances §§ 54.04, 54.10Village of East Dundee Code of Ordinances Chapter 54, Construction of Utility Facilities in the Rights-of-Way, requires a permit (§ 54.04) before a utility facility is constructed, altered, or removed within a public right of way, and conditions that permit on posting a security fund (§ 54.10) covering the work. The required amount is set on the permit. Confirm your exact figure and permit conditions with the Department of Public Works before filing.

You need this bond if you are

A utility or contractor installing water, sewer, gas, electric, or telecom lines within an East Dundee public right of way
A permittee constructing, altering, or removing a utility facility subject to the Village's Chapter 54 security requirement
Anyone the Village has conditioned a Chapter 54 permit on posting security before work begins
A principal renewing or replacing a right-of-way security fund whose original permit period has expired

One application, issued instantly.

These are the actual underwriting fields — no credit section, because this application doesn't collect credit information.

Start the application →
FAQ

Common questions.

How much is the East Dundee right of way bond?Premiums cost 1% of the bond amount, with a $100 minimum. The Village sets the required security amount on your utility facility permit under Code §§ 54.04 and 54.10 — there is no single citywide figure.
What amount should I enter?Use the bond amount shown on your East Dundee right-of-way permit application. If you are unsure, Public Works can confirm the figure before you apply.
What does the bond guarantee?It secures the restoration of the right of way and compliance with your permit's conditions. If the right of way is left damaged and the Village is harmed, it can draw on the bond; you then repay the surety — it is not insurance for you.
Where do I file it?File the executed bond with the Village of East Dundee as part of your right-of-way permit application. Your e-signed bond arrives by email, ready to submit.
Is there a credit check?The application collects no credit information, so most applicants approve instantly. If a check ever runs on a larger bond amount, it's a soft pull that won't affect your score.
Related bonds

Other Illinois bonds.

Get your East Dundee permit moving today.

From $100, soft pull only. Enter your amount and file with the Village the same day. Free until issued.

Your premiumfrom $100
Apply now →