The purpose of this project is to renovate two Cystoscopy rooms (214 and 215), Procedure Room (212), Procedure Room (211), Check-In area, Office, Control, Vestibule, Dressing, Toilet and Corridor. The two Cystoscopy rooms (214 and 215) will also receive new medical equipment.
The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Period of Performance is estimated to be 720 days.
This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Contractor shall prepare rooms 214 and 215 to receive new equipment. A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the design. In addition, Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area and restroom are included in this scope of work
The contractor performs construction to renovate cystoscopy rooms 214 and 215, procedure rooms 212 and 211, check-in/waiting, office, control room 215-1, electrical room 214-1 with new panels, vestibule, dressing, toilet and corridor. Work includes site preparation for Siemens Uroskop Omnia and other medical equipment, demolition and new partitions, lead-lined walls, ceilings, finishes, casework, doors and hardware, structural framing and equipment bracing, plumbing and medical gas, HVAC ductwork and piping, electrical power and lighting, telecommunications, nurse call, access control, fire suppression and fire alarm, with phased infection control and coordination to maintain hospital operations.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""FAR 52.225-2 Buy American Certification.pdf"127626"file"".pdf""1""2026-10-19T17:55:33.72+00:00""8383f9fec3fc4bd2831f48da20c928c3""public""0""public""ff87d21adee14682acfa66c5fa06ef87""0"5"0""UPDATED-528-19-102-BuffaloUrology Combined Specifications 05-18-2026.pdf"13011711"file"".pdf""1""2026-10-19T17:55:33.72+00:00""d604bcb2b94f4c90aab273da7fedda87""public""0""public""b752e30e68ef4902b2f01d8433bd4ec7""0"4"0""Facility Approved Finishes and Devices.pdf"89796"file"".pdf""1""2026-10-19T17:55:33.72+00:00""ebec78cfefa44bada336b3105daa29f6""public""0""public""8229759ac39241f08543bd0c6554b3d0""0"3"0""UPDATED- Final Construction Drawings-2_01.pdf"84277365"file"".pdf""1""2026-10-19T17:55:33.72+00:00""12e30c9e349d4717a265927c68360868""public""0""public""a391201d4f774e019725e2338bbf43e9""0"2"0""36C24226B0065_1.docx"7061072"file"".docx""1""2026-10-19T17:55:33.72+00:00""bf084085a82e48729985df40a9d6e428""public""0""public""b4685892a3f84df6ae7795dfaff15a09""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice febca32da44741ebb4db61c4adf224ae), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.