Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
The contractor shall replace the ECUs on all three EPSS generators and all associated appurtenances, including custom-fabricated wiring harnesses, pulse-controlled fuel injectors, and voltage regulators, to restore automatic EPSS operations. The work must be performed by factory-certified technicians from an authorized representative of Detroit Diesel/MTU. The contractor shall hire an independent, verified Commissioning Agent to perform a complete generator system acceptance test in accordance with NFPA 110, including full-capacity load bank testing and integrated EPSS functional performance testing. The contractor shall also provide documented training to maintenance staff, O&M manuals, and as-built wiring diagrams.
We post new uncategorized opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Amend 0003.pdf"1246801"file"".pdf""1""2026-11-20T15:34:25.414+00:00""95191938e8a74d3d8e4b001606184dc0""public""0""public""3d30478fa7d44cc9bbed4f6d03062615""0"8"0""Amend 0002.pdf"1059738"file"".pdf""1""2026-11-19T16:14:03.495+00:00""ef73f953616c42d9ae93c62a3a8b7ab0""public""0""public""28d60b6b289c4ecc809592495960a8c2""0"7"0""Amend 0001.pdf"1465967"file"".pdf""1""2026-11-16T18:10:28.349+00:00""f6b366f0c20c41e7821c1b2bfbe01537""public""0""public""65f0b9d4368c4189bf39c50877ee0445""0"6"0""RFP 270700.pdf"206189"file"".pdf""1""2026-11-13T17:43:57.89+00:00""a431333188a04a5ebfc52cc3c07bbcc2""public""0""public""8571e07be67e4ac58af66910081b621e""0"5"0""NH100 REPLACE ENGINE CONTROL UNITS ON 3 GENERATORS revised.pdf"117215"file"".pdf""1""2026-11-13T17:43:57.89+00:00""ca20e420f4f94ef1ac4bf9305b7f06c3""public""0""public""5f7ca5ad876e4ac1a954950f7c9d3e1c""0"4"0""Combined DIV 01 specs small projects.pdf"568081"file"".pdf""1""2026-11-13T17:43:57.89+00:00""25bdb014c25e4012909df21a6619ee37""public""0""public""94d932fb783a4b15b3ea37752ea56e02""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice fb648b5b7455433fb4b126c28e4d2b14), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.