20 November 2026: The Government has updated the Attachments C2, C3, T1, and T2 associated with Amendment 0001 to be word documents rather than PDF. The Government has also updated the Attachments P1 and P2 to ensure the fill-able fields within the pdf file are editable. No changes have been made to the content of any of the attachments, rather simply updating file format to ensure usability.
The purpose of Amendment 0001 is to: 1) update instruction in Section J, Attachment L1 Rev 01, Part A, Paragraph 4.1.1 to clarify marking requirements and Part B Paragraph 2.3.1 regarding adverse past performance; 2) revise applicable Attachments to reflect updates to CUI markings; 3) revise language in Section J, Attachment M1 Rev 01, Part A, Paragraph 1.4 and Part B, Paragraph 1.2 clarifying Evaluation Process; 4) update Attachment C2 Table 3 to remove the requirement to include DFAS DoDAAC and POC information; 5) provide a revised Attachment 01 to correct the RFO number as well as update the Function description of the Management Analysts (Acquisition), Senior, BLS SOC 13-1111(Key). The due date for proposals remains unchanged: see Block 9 of the SF33.
Naval Air Warfare Center Aircraft Division (NAWCAD), Webster Outlying Field (WOLF), Airborne Systems Integration (ASI) Division intends to issue a competitive, total small business set-aside Request for Offers (RFO) under the SeaPort Next Generation (NxG) Multiple Award Contract for Airborne Systems Integration (ASI) Technical/Project Management Support (TPMS).
The resulting Cost-Plus-Fixed-Fee task order will provide technical project-management, data-management, and acquisition support for ASI Division requirements. Support includes project planning, execution, monitoring, and closeout; division-level planning and performance reporting; data analytics, metrics, and repeatable best practices. The effort supports multiple defense acquisition programs and weapons systems, including—but not limited to—VH-92A, E-6B, unmanned carrier aviation, counter-uncrewed systems, V-22, and Naval Sea Systems Command Integrated Warfare Systems Program Executive Office requirements.
Performance is anticipated at Government sites in St. Inigoes, Maryland, and Patuxent River, Maryland, with limited contractor-site performance within 50 drivable miles of NAWCAD WOLF. A Secret Facility Clearance Level is required.
The Contractor shall provide technical project management, data management, and acquisition support for ASI Division requirements. Technical PM support includes project initiation, planning, execution, monitoring, controlling, and close-out; cost estimation; risk management; financial management; and acquisition planning. Data management support includes producing graphical representations of analytics data, creating interactive multimedia products, maintaining Division sites, conducting assessments of business operations, and supporting training content development. Acquisition support includes translating project requirements into supply acquisition strategies, generating acquisition documentation, preparing Purchase Requisitions, and supporting post-award service contract management. The effort supports multiple defense acquisition programs and weapons systems, including VH-92A, E-6B, unmanned carrier aviation, counter-uncrewed systems, V-22, and Naval Sea Systems Command Integrated Warfare Systems Program Executive Office requirements.
We post new uncategorized opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20670-5000""PATUXENT RIVER""MD""USA""NAVAL AIR SYSTEMS CMD HEADQUARTERS""NAVAL AIR STATION""Att P1_rev01 - ASI TPMS Past Performance Information Form.pdf"646897"file"".pdf""1""2026-11-20T19:13:13.607+00:00""1bc597212413474f97f1138551d9e4a6""public""0""public""973cb0f5ee87450da166ced3fd26aa61""0"37"0""Att P2_rev01 - ASI TPMS Contractor Performance Assessment Questionnaire (CPAQ).pdf"356113"file"".pdf""1""2026-11-20T19:13:13.607+00:00""fc0ef7c3cbdc4e5bb6efab521cf67ce9""public""0""public""743b426ab9364ba5af603654576906fa""0"36"0""Att T1_rev01 - ASI TPMS Key Personnel.docx"59817"file"".docx""1""2026-11-20T19:13:13.607+00:00""30d85c64be9e405781d63979d17aeab8""public""0""public""627f36350be147c7a94c38b9d7d37a14""0"35"0""Att T2_rev01 - ASI TPMS Sample Tasks.docx"28738"file"".docx""1""2026-11-20T19:13:13.607+00:00""be27564696ae426a9adbe15cdb2fa1ac""public""0""public""3ba860914fe14be9a94adfa7c17141be""0"34"0""Att C2_rev01 - ASI TPMS Cost Reimbursable Narrative.docx"78188"file"".docx""1""2026-11-20T19:13:13.607+00:00""17756fc77b8b451181b5bef0c79460b1""public""0""public""d157ef0f1c2041eeaa6c2dc77cea0e07""0"33"0""Att C3_rev01 - ASI TPMS Fixed_TandM Price Narrative.docx"47145"file"".docx""1""2026-11-20T19:13:13.607+00:00""eab9e89608604903b7d659b23dcdcbc8""public""0""public""f8d14bd0722143b6bcfa463cff3ba3f5""0"32"0""Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf"250621"file"".pdf""1""2026-11-19T18:42:22.882+00:00""5ec03085ffc44f1f9d3b706e044e479b""public""0""public""01be289def4c4c5db749994a2c6124b4""0"31"0""N0042127R1008 AMD_0001 Conformed.pdf"2653613"file"".pdf""1""2026-11-19T18:42:22.882+00:00""4d7f0cf9a271402bbf7da8cea5af33bf""public""0""public""eb273cdd1d6d429e9776fa4c9e4e15c5""0"30"0""Att L1_rev01 - ASI TPMS FAR 16.507-2 CPFF.pdf"792729"file"".pdf""1""2026-11-19T18:42:22.882+00:00""31be477a56a6423da0a25b83920e6f78""public""0""public""046568a4828846e993c94c203c43611d""0"29"0""Att C2_rev01-ASI TPMS Cost Reimbursable Narrative.pdf"689508"file"".pdf""1""2026-11-19T18:42:22.882+00:00""ae5e23c0fae141ba8d19f9b35fad47f1""public""2026-11-20T19:13:13.607+00:00""1""public""d1c811f4339c4c6b9ab8f86a148bb85b""0"28"0""2026-11-20T19:13:13.607+00:00""N0042127R1008 AMD_0001 SF 30.pdf"579775"file"".pdf""1""2026-11-19T18:42:22.882+00:00""ff21ad7e0f2d4899a518dc07b5cfc2b2""public""0""public""740e6691f1634932bba43e008c069671""0"27"0""Att C3_rev01- ASI TPMS Fixed_TandM Price Narrative.pdf"610895"file"".pdf""1""2026-11-19T18:42:22.882+00:00""ddde292326234023a79f68c7a7edbe23""public""2026-11-20T19:13:13.607+00:00""1""public""59bfb85107c3443184955d3149504752""0"26"0""2026-11-20T19:13:13.607+00:00""Att 01_rev01- ASI TPMS SOW.pdf"594885"file"".pdf""1""2026-11-19T18:42:22.882+00:00""a0a31067c20c44bc9dc37afdd835d23e""public""0""public""6a922ca7ab5343b4816bc639da2d7a33""0"25"0""Att T1_rev01 - ASI TPMS Key Personnel.pdf"491463"file"".pdf""1""2026-11-19T18:42:22.882+00:00""7291d83c143f464f8f6d871f282cca66""public""2026-11-20T19:13:13.607+00:00""1""public""258a133e282a44669ccd6ef4e1d41c10""0"24"0""2026-11-20T19:13:13.607+00:00""Att P2_rev01 - ASI TPMS Contractor Performance Assessment Questionnaire (CPAQ).pdf"464247"file"".pdf""1""2026-11-19T18:42:22.882+00:00""23b8f1159fd54a789dcc5952c0f0860d""public""2026-11-20T19:13:13.607+00:00""1""public""05722e25790743bcb32b94a3f151b10e""0"23"0""2026-11-20T19:13:13.607+00:00""Att T2_rev01 - ASI TPMS Sample Tasks.pdf"426895"file"".pdf""1""2026-11-19T18:42:22.882+00:00""35a2a83da0d64f7ab757edfb743534df""public""2026-11-20T19:13:13.607+00:00""1""public""89690669361340dbb895f2f9e4be5953""0"22"0""2026-11-20T19:13:13.607+00:00""Att P1_rev01 - ASI TPMS Past Performance Information Form.pdf"213626"file"".pdf""1""2026-11-19T18:42:22.882+00:00""3e32aba68acb4b7f8c7c4dbee01792b7""public""2026-11-20T19:13:13.607+00:00""1""public""fcd42217b3f9452ea2067edaee2ff356""0"21"0""2026-11-20T19:13:13.607+00:00""Exhibit A - ASI TPMS CDRL.docx"546785"file"".docx""1""2026-11-10T20:26:04.971+00:00""7aa5646d4f314a56a668e5ff546a0649""public""0""public""7c9bd25b29af43bf95db1dda417c9031""0"20"0""Att 02 - N0042127R1008_DD254_Signed rev2.pdf"286362"file"".pdf""1""2026-11-10T20:26:04.971+00:00""79ac22ad5ac04a09afd77a84770cb897""public""0""public""21009e892b66469a9f4ba301dbbe102f""0"16"0""Att 04 - Contract Surveillance Plan.docx"78102"file"".docx""1""2026-11-10T20:26:04.971+00:00""e9e55a044e574807b5412df50bd7c0bc""public""0""public""f125455a3bf14682b9640ff998cd8eef""0"13"0""Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx"342572"file"".xlsx""1""2026-11-10T20:26:04.971+00:00""17c9c7a13b704cf8b1d1ee3698ab8e02""public""0""public""b57c9061e18649f48550f0a0f14f537f""0"12"0""Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx"66465"file"".xlsx""1""2026-11-10T20:26:04.971+00:00""7eefa08305694d4db74c360bbf52b6a0""public""0""public""fe93869229c24778997fdeadc8f13954""0"10"0""Att 03- List of Authorized Key Personnel.docx"31632"file"".docx""1""2026-11-10T20:26:04.971+00:00""626140622ab545fcbb53d1f03d6810a4""public""0""public""51c2d6261eff43b0b9fa45a2f1e86f0e""0"8"0""Att 06 - ASI TPMS OCI List.pdf"307820"file"".pdf""1""2026-11-10T20:26:04.971+00:00""18c9747c3973431b977ae56d0e814f32""public""0""public""86a40283b89e4f6bb7b83cb846e659a7""0"7"0""Att 05- COR Designation Letters.docx"28752"file"".docx""1""2026-11-10T20:26:04.971+00:00""df2fd0ebb9fa4e7595d5956c67fc5b3c""public""0""public""17c09b21b3d74610a335523601909157""0"6"0""Att 10- NAWCAD Contractor Manpower Report.xlsx"21886"file"".xlsx""1""2026-11-10T20:26:04.971+00:00""31eb52876c9e483cbabb87c5e32a027e""public""0""public""a982a9e2994740deb7123196bbae00d6""0"5"0""Att 09 - TDL CDRL attachment COR only May 2026.xlsx"59099"file"".xlsx""1""2026-11-10T20:26:04.971+00:00""15c24d83133c4c82acd7f8c5e1778ff6""public""0""public""6a35dc6dfa574bba81e1184e28e60271""0"4"0""Att C4 - ASI TPMS LCAT Capacity Labor Hours.xlsx"22789"file"".xlsx""1""2026-11-10T20:26:04.971+00:00""9b32b8444ba34e649841be0ebe6e0cb3""public""0""public""2b143e2c78a74b40b56660fd5c3144f1""0"3"0""Att 07 - ASI TPMS List of Approved Subcontractors.docx"23959"file"".docx""1""2026-11-10T20:26:04.971+00:00""4c809376f6c24c328704a4f7eeb6d97a""public""0""public""a4b2738dc3d24e10ad6595fa3d165264""0"2"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6564d1d7e728477499d1a8a836118eaa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.