This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room.
PLEASE NOTE the important information related to this RFP:
Pre-Proposal Meeting and Site Visit: October 27, 10:00a CDT
Last Day for Questions: November 5, 2026, 4:00p CDT
PROPOSALS DUE: December 3, 2026, 2:00p CDT
To attend the Pre-Proposal Meeting and Site Visit, PPE is required.
As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. **AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. ** Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.
Please note that when entering Fermilab:
All vehicles are subject to search
No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site.
No explosives or any other apparatus or material hazardous to the public or property are allowed on site.
No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.
No personal alcohol or marijuana
No Smoking or vaping within buildings and within 15-25 feet of entrances
Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
The Subcontractor shall furnish all labor, materials, equipment, and supervision to install the LCW piping system, including all major LCW equipment (centrifugal pumps, shell and tube heat exchanger, reservoir expansion tank), process loop equipment (deionization skid, particulate filter, dissolved oxygen removal skid), all process instrumentation and filters, structural supports for piping and equipment (including foundation base for centrifugal pumps), supply of all piping and piping hardware (valves, flanges, gaskets, fittings), and electrical installation (excluding controls wiring). The work also includes welding, inspection, and leak testing of the piping system.
We post new plumbing opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""F10151066-D-F37 LCW PUMPROOM PID.pdf"3826057"file"".pdf""1""2026-11-16T14:40:07.299+00:00""e5ef6c6c2e4a400e927ce3e40bf4fbf0""public""0""public""7b6f7c7011354d3a8d3f876f2917fd37""0"35"0""F10170043-B-ALL SHEETS 11-13-26.pdf"14695966"file"".pdf""1""2026-11-16T14:40:07.299+00:00""1330ab199a2a46259335ecda17637904""public""0""public""1e23599a078840f2af0d162078c3678e""0"34"0""Addenda_4.pdf"139230"file"".pdf""1""2026-11-16T14:40:07.299+00:00""c4ac763fe84340c6ab311f56237889cd""public""0""public""3a77d63d44dd4219b076e7fd82a3e07a""0"33"0""Addenda_3.pdf"142156"file"".pdf""1""2026-11-12T21:30:48.157+00:00""c84946229de640048ca2083852b8d719""public""0""public""d795ea2f98d44c45ba1b07625ae5442b""0"32"0""Addenda_2.pdf"168391"file"".pdf""1""2026-11-03T20:46:09.345+00:00""0263c66a5b254304ac91de1df9854971""public""0""public""f984841c0de742869742104275bd521c""0"31"0""HX drawing for F37.pdf"436616"file"".pdf""1""2026-11-03T20:46:09.345+00:00""0f94957fbb3342be817c92948b326c23""public""0""public""90c272cc45c643c89f314b1100b70ba2""0"30"0""PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf"4403395"file"".pdf""1""2026-11-02T15:14:37.42+00:00""9a74243296944f78a382ecdbd670193c""public""0""public""597b6c123bd041ea83e5d9c6f0451faf""0"29"0""PIP-II F37 Pump Room Concrete Pad Specification.pdf"57673"file"".pdf""1""2026-11-02T15:14:37.42+00:00""9c9e9b8f4038455d96e1a1bb69b6dde5""public""0""public""d1a3cff3b47e4abc9392dd42e53c57b6""0"28"0""Flowserve pump data proposed.pdf"1383657"file"".pdf""1""2026-11-02T15:14:37.42+00:00""a0b65f25602f468b8f72250246436549""public""0""public""68ab4e664576483cafd6702963017995""0"27"0""Addenda_1.pdf"167330"file"".pdf""1""2026-11-02T15:14:37.42+00:00""c8db842e3e134954923304a9d4fdf51c""public""0""public""dff40f6a07d14d30a4399fc80274afd2""0"26"0""378854_MR.pdf"330581"file"".pdf""1""2026-10-08T13:51:28.814+00:00""396a8fa406d94effa7fc365cb25be97f""public""0""public""d72d5f66bd274e0d9edafb33988ba8b2""0"25"0""EXHIBIT_25_Drawings.zip"17879355"file"".zip""1""2026-10-08T13:51:28.814+00:00""e7892dd7c7114d729be154e46d82da33""public""0""public""a52d58976a9c477892f3a8c93b60097f""0"24"0""EXHIBIT_24_Sample Subcontract.pdf"214172"file"".pdf""1""2026-10-08T13:51:28.814+00:00""4ed23a230a9b4b21a851962d800d517e""public""0""public""620b777dad74407099202e6a0cd8c0bc""0"23"0""EXHIBIT_23_Performance Bond.pdf"104775"file"".pdf""1""2026-10-08T13:51:28.814+00:00""dbcc72fc14fa45749069d0a8de13d43a""public""0""public""9771eed187bb4ac0b143aa4fe4eecda8""0"22"0""EXHIBIT_22_Payment Bond.pdf"117485"file"".pdf""1""2026-10-08T13:51:28.814+00:00""dfdf28c52d4e4101a63b10ff0b7666ec""public""0""public""91348510a78b46d78eb8291e21f7c7fc""0"21"0""EXHIBIT_21_Bid_Bond.pdf"117786"file"".pdf""1""2026-10-08T13:51:28.814+00:00""e96e46ca7fcd4e5d933b598e8bb61e33""public""0""public""368a821c2033489d94f5c6dae077b448""0"20"0""EXHIBIT_20_SF1413-23a.pdf"193951"file"".pdf""1""2026-10-08T13:51:28.814+00:00""3bde6f82b04943de875571e38ba34ae4""public""0""public""1439bc86ded843668244ba7bd3ae7520""0"19"0""EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf"910721"file"".pdf""1""2026-10-08T13:51:28.814+00:00""acbb3345eacd4b83b9eb97b8ddcd34d3""public""0""public""4b0720b0284d479b94fb2356158f517f""0"18"0""EXHIBIT_18_Injury_Illness_Questionaire.pdf"116156"file"".pdf""1""2026-10-08T13:51:28.814+00:00""103813e6f5c34fc6a114d22fa94086ad""public""0""public""a56c147765c44eb882e2ec6e57a72935""0"17"0""EXHIBIT_17_FL-55.pdf"401439"file"".pdf""1""2026-10-08T13:51:28.814+00:00""ed602bdb98d547f3af4a733a2d7b4975""public""0""public""76d9c29703a24cbaa6f7a8a24c9f12f8""0"16"0""EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf"239355"file"".pdf""1""2026-10-08T13:51:28.814+00:00""d4df66e30b8043d2a2d2b60f8df76c2b""public""0""public""6d4d428e0d8a4bbdb103427094b6cda8""0"15"0""EXHIBIT_15_SARC.pdf"482741"file"".pdf""1""2026-10-08T13:51:28.814+00:00""9c8e08a0da8d4b798c5a929def031d89""public""0""public""4b2ef73118e0420f90fbe1d753ccc3a2""0"14"0""EXHIBIT_14_Proposal Certifications.pdf"415824"file"".pdf""1""2026-10-08T13:51:28.814+00:00""117b06449ea645d5838f7569d4af2c6c""public""0""public""92e7336379e14543b23134df2b6f5cb5""0"13"0""EXHIBIT_13_CESHC.pdf"438383"file"".pdf""1""2026-10-08T13:51:28.814+00:00""5c5d529579354e79b39aa4b7cb89af7d""public""0""public""5dadb1252a3d42d581f30cafd7f38622""0"12"0""EXHIBIT_12_014100 Quality Requirements.pdf"169844"file"".pdf""1""2026-10-08T13:51:28.814+00:00""af6b479617d84f37bd5048c0c6f3fa60""public""0""public""fc66f83870dc413fb719aff27c54ad6e""0"11"0""EXHIBIT_11_013300 Submittals.pdf"149814"file"".pdf""1""2026-10-08T13:51:28.814+00:00""ef5ab9c65fa4455095c82be9c19d1bcc""public""0""public""c78f383c2bd445f58790ae2030533542""0"10"0""EXHIBIT_10_013100 ESH Requirements.pdf"940635"file"".pdf""1""2026-10-08T13:51:28.814+00:00""c3e42ffff3de473b92a5c140b0c630b9""public""0""public""9dc2af9071e04000bcaf9749b03d2809""0"9"0""EXHIBIT_9_010010 General Requirements.pdf"344764"file"".pdf""1""2026-10-08T13:51:28.814+00:00""29a132ced8f04aebaf1c8d9b0fd327e7""public""0""public""2d0c9f561c224924a8db8ca32e2cbd2c""0"8"0""EXHIBIT_8_FESHM 5034 Pressure Testing.pdf"524053"file"".pdf""1""2026-10-08T13:51:28.814+00:00""c756bfba9a1143fe85cbbdc833ace1a0""public""0""public""b8ff53519eeb4b68bfc9a2b70956e107""0"7"0""EXHIBIT_7_ADDENDUM TO FESHM.pdf"178056"file"".pdf""1""2026-10-08T13:51:28.814+00:00""122154115e6440469c6ad7395f80a495""public""0""public""df8b9ed33148453eb4399f6ba5978e2a""0"6"0""EXHIBIT_6_5031_1 Piping Systems March 2025.pdf"1534289"file"".pdf""1""2026-10-08T13:51:28.814+00:00""60eac18bead949f2af7b88f22a09827b""public""0""public""69dd460e20834e69ae08011aed672f8d""0"5"0""EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf"772097"file"".pdf""1""2026-10-08T13:51:28.814+00:00""a2906064e9f94846b317c422192f5e61""public""0""public""f1079a2501cd4fc29687e99a8ec6a736""0"4"0""EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf"351059"file"".pdf""1""2026-10-08T13:51:28.814+00:00""5002e5d9390341f980368e75ba023f02""public""0""public""60470445f470450f8b5ce33cf4b05fcc""0"3"0""EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf"198435"file"".pdf""1""2026-10-08T13:51:28.814+00:00""9d2daf7c99514f2d9cab1a620841633c""public""0""public""48d6741ec1494dd2b3edc66d5d443d55""0"2"0""EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf"327220"file"".pdf""1""2026-10-08T13:51:28.814+00:00""509150948ed44588b37b373dcd67b0ee""public""0""public""625f7b96943847c9a7192bb73ae701e8""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice e1f72176eb994530a1340e9bf2a51a91), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.