4 EACH - Handle, P2TC, Per Drawing # BL-58357, Revision A, For 155mm XM282 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as Exhibit A. Along with general data drawings attached as ATTACHMENT A. (CN 2, 9, 11, 12, 23) INSPECTION REQUIRED WBS: EH26UWV958EHM71
1 EACH - Handle, P2TC, Per Drawing # BL-58357, Revision A, For 155mm XM282 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as Exhibit A. Along with general data drawings attached as ATTACHMENT A. (CN 2, 9, 11, 12, 23) INSPECTION REQUIRED WBS: EH26UWV957EHM71
The contractor must furnish Handle, P2TC, per Drawing # BL-58357, Revision A, for the 155mm XM282 Cannon: 4 EACH under WBS EH26UWV958EHM71 and 1 EACH under WBS EH26UWV957EHM71. Each item is to include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) attached as Exhibit A, along with general data drawings attached as ATTACHMENT A. Inspection is required.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"12189-4000""WATERVLIET""NY""USA""KO CONTRACTING OFFICE""1 BUFFINGTON ST BLDG 10""12521199_3 shts_rev A (3).pdf"1229901"file"".pdf""1""2026-11-02T18:43:35.145+00:00""723c39c3a2494588bdb0f920541d0fb1""private""0""controlled""b736057fcbe24730b08580b6cdaff33f""1"6"0""BL-58357_Rev_A.pdf"712984"file"".pdf""1""2026-11-02T18:43:35.145+00:00""5e26f46f682f45d5af2135ea38061820""private""0""controlled""0b07f286ca1d44049770ea1425fd9c87""1"5"0""Benet_Prototype_Inspection_Requirement_2020-08-19_LRR_Final_Draft.docx"38114"file"".docx""1""2026-11-02T18:43:35.145+00:00""3ecb80c8b1ff45adb1b8bcb970cbfc18""private""0""controlled""6f9cbd6bdb6b4a6b87499b127a5a1e78""1"4"0""A_-61240068-BL-58357.docx"28821"file"".docx""1""2026-11-02T18:43:35.145+00:00""209f8a4750e846c38a417607888c3c6a""private""0""controlled""ebed8207e27a4af2b2fd90b93a57d8fb""1"3"0""A_-6125001Z-BL-58357.docx"28834"file"".docx""1""2026-11-02T18:43:35.145+00:00""d136b31d8fa141c5b882526ccfa34576""private""0""controlled""42da1df6be164b0e9b6639ed63601ac3""1"2"0""010731-QAP-APPX-BL.docx"69166"file"".docx""1""2026-11-02T18:43:35.145+00:00""8b764909189c4e1e889655e496656a6a""private""0""controlled""cb0b4cfe5ece4f07a34d053caa5c0ad5""1"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911PT27QA022¬iceType=SolicitationNotice"0"link""1""2026-11-02T18:40:06.968+00:00""39399c84ce984bf288b854d0f2bdffd2""public""0""PIEE Solicitation Module Link for W911PT27QA022""public""a71f6caa39cb4abf83c9616181419b2b""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-02T18:40:06.968+00:00""d2a5d458e889493b98059ba81d64ec6a""public""0""Web Based Training for the PIEE Solicitation Module""public""97074a07f3a7499c937c91ce7e9b042a""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-02T18:40:06.968+00:00""d267ba12717747e18a30beaf76fdadeb""public""0""Registration Instructions for the PIEE Solicitation Module""public""d6e56e1a841448d8a2143337898e9520""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-02T18:40:06.968+00:00""c8893a4ef7da4c6293bbfe36b0378c28""public""0""Department of Defense Procurement Toolbox""public""bc731568ce874dcd9417b7c84c115ecc""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice db83085ee9834504a45e0968315c77be), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.