Please review all enclosures and attachments for details and requirements. Offerors shall submit documents to the Contract Specialist designated in this solicitation. Your quote/proposal pricing should be submitted on Enclosure C, but please also submit a separate document with details as to how your company meets the requirements of the RFQ (your standard proposal/quote document).
STEP files are available but are unable to be loaded into this system. Please contact the Contract Specialist for those files to be emailed. A technical note for these files: These STEP geometry files are NOT mechanical construction files. The files show a simplified view the 3D stripline kicker geometry based on the electromagnetic design, as illustration for the mechanical implementation of a RF test mockup (no vacuum) and of a vacuum compatible prototype stripline kicker. Beside that, there still is substantial thermal analysis to be performed by the vendor.
All questions are due, via email, to the Contract Specialist by 11/20/2026 at 5pm EST.
The contractor shall perform the detailed mechanical design, fabrication of an RF mockup, manufacturing of one UHV-certified prototype stripline kicker, and all associated engineering, thermal analysis, RF/electrical verification, cooling testing, vacuum certification, and documentation. Specific tasks include: completing the 3D mechanical design of the kicker assembly (vacuum vessel, stripline electrodes, cooling channels, feedthroughs); fabricating and testing a shortened brass RF mockup; manufacturing the full prototype in accordance with BNL-provided electromagnetic design; supporting Preliminary and Final Design Reviews; performing VNA/TDR and stretched-wire measurements; conducting thermal/cooling verification tests; and delivering as-built drawings, CAD models, and a complete documentation package. The period of performance is 18 months from contract effective date.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""11973""Upton""NY""USA""P.O. Box 5000""Request for Quote 483335.pdf"303044"file"".pdf""1""2026-10-20T15:02:33.233+00:00""dfc384b2b04c4caf8a97c0a46169a6c4""public""0""public""671d1c048af146b399eb8ca601329107""0"9"0""Attachment 1 - Statement of Work EIC-INS-SOW-017.pdf"489100"file"".pdf""1""2026-10-20T15:02:33.233+00:00""92bf44d0d6fe430b8cbd56e1de1139cc""public""0""public""8179cf94ea1545f394dc4103b7b7b47d""0"8"0""Attachment 2 - Specification EIC-INS-SPC-010.pdf"525121"file"".pdf""1""2026-10-20T15:02:33.233+00:00""3fa74dba6f31409d9de098f22a44d048""public""0""public""6ae5196571b546f3ae5397d9e79dcba9""0"7"0""Enclosure A - Draft Contract with incorporated Terms and Conditions.pdf"220312"file"".pdf""1""2026-10-20T15:02:33.233+00:00""35b990ae30ec44eaaf6ee0a3d93b491d""public""0""public""5e6e558d7e1f45eeb3b5f2ad279542fb""0"6"0""Enclosure B - AMS Form 050 Reps and Certs.pdf"1767815"file"".pdf""1""2026-10-20T15:02:33.233+00:00""f96ec70976fe44c9a6c8f6b0f7f7b984""public""0""public""2c55c33fd0ad442aabd592f6214a34ac""0"5"0""Enclosure C - AMS-Form-043.pdf"210115"file"".pdf""1""2026-10-20T15:02:33.233+00:00""5bdbfa9f239f49e39bcced1ea53af4c5""public""0""public""4f87c2471358446ba160b739cb4f16c1""0"4"0""Enclosure D - Vendor ACH Authorization Form.pdf"116581"file"".pdf""1""2026-10-20T15:02:33.233+00:00""9907afe79874449aa2a17e76a2f71ec0""public""0""public""d1896b5387fa4528ab868857914a446f""0"3"0""Enclosure E - W-9 Form (Domestic Vendors).pdf"140815"file"".pdf""1""2026-10-20T15:02:33.233+00:00""5bc1fd8b994c47a9967fcdb89faf7e23""public""0""public""014656cbc4f846e78636db65c2af0c7b""0"2"0""Enclosure F - W-8 Form (Foreign Vendors).pdf"314634"file"".pdf""1""2026-10-20T15:02:33.233+00:00""71849c94f19344fbb490ab29b834a686""public""0""public""0a8445c0170e4abf89c502dac5423543""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8bac40ceff9c4bcc808bc7b8542b9a7c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.