The Contractor shall provide all labor, materials, OEM replacement filters, tools, test equipment, and qualified service personnel to perform replacement of STERIS Clean Flow Pro steam filters and calibration of associated equipment at the VA San Antonio Healthcare System (Audie L. Murphy VA Medical Center), San Antonio, TX, and the Kerrville VA Medical Center, Kerrville, TX, in accordance with the Statement of Work (SOW).
The contractor shall provide all labor, materials, OEM STERIS replacement filters, tools, test equipment, and OEM-certified Field Service Engineers to perform replacement of STERIS Clean Flow Pro steam filters and OEM-standard calibration of associated equipment at the Audie L. Murphy VA Medical Center in San Antonio, TX, and the Kerrville VA Medical Center in Kerrville, TX. The work includes replacing filters on five specific units (serial numbers W38595655/004, W38595659/010, W38595659/006, W38595658/005, and W38595659/008) and calibrating equipment to OEM standards. The contractor must provide a Field Service Report at completion. The base period is 1 year, with four 1-year option periods. Work hours are Monday through Friday, 7:30 am to 4:30 pm, excluding federal holidays.
We post new equipment maintenance & rental opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""S02_36C25727Q0071.pdf"698757"file"".pdf""1""2026-11-03T16:02:27.069+00:00""eb86729ff7a74579a1f1632366392f08""public""0""public""ffbbe8a5edde42b7901a953d6004e3c4""0"4"0""D.1_WAGE DETERMINATION 2015-5253.pdf"257810"file"".pdf""1""2026-11-03T16:02:27.069+00:00""24f9ae4c3d6b49f28f3de54636d57080""public""0""public""96b9166a4de44353a9a0b105f89e6ce7""0"3"0""D.2_WAGE DETERMINATION 2015-5293.pdf"257854"file"".pdf""1""2026-11-03T16:02:27.069+00:00""5908b9ec243f4d47b01488cc1f7a0929""public""0""public""b9d68f77f1d347f28524ca9e8a8364eb""0"2"0""D.3_PAST PERFORMANCE REFERENCES.pdf"133637"file"".pdf""1""2026-11-03T16:02:27.069+00:00""119f9cb09709417e87a4b3aac46c3ae4""public""0""public""f7f9b483f2a14ee1ac43fe91438bd0b8""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d8763b1896ed4daca1299d4732cbbe62), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.