**PROJECT DESCRIPTION: **
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
**SCOPE OF THE WORK: **
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
**ANTICIPATED SCHEDULE: **
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
**ESTIMATED COST RANGE: **
Between $2,000,000 and $5,000,000
The scope of work includes pavement rehabilitation of 1.3 miles of roadway incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement with fog seals and tack coats; drainage improvements including installation of cross culverts, reconstruction of an existing headwall, ditch grading and reconditioning, berms, bank stabilization, flared end sections, and riprap aprons; earthwork and stabilization including embankment benching, slope stabilization, slope scaling, and bridge approach repairs at the eastern abutment; and safety and traffic control items including new regulatory and warning signs, pavement markings, and boulder placement. The project is structured with a base Schedule A and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
We post new asphalt opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""80228""LAKEWOOD""CO""USA""12300 W. DAKOTA AVE""Questions and Answers AZ BL COLO 7582(1) Burro Creek Road-response10.27.2026.pdf"218010"file"".pdf""1""2026-10-27T21:00:35.053+00:00""b9810f23095e4d43b64e9dad7956c8b4""public""0""public""22f0cd48be8c4138b7a5457df3685ac5""0"19"0""AZ BL COLO 7528(1) IFB.pdf"2066234"file"".pdf""1""2026-10-15T19:09:32.533+00:00""5134b10429d649c2a21dddc767a1c2e5""public""0""public""d669ae0bebb34ee58a4490437022ad05""0"18"0""AZ BL COLO 7528(1) Burro Creek Road_Plans.pdf"150572939"file"".pdf""1""2026-10-15T19:15:37.413+00:00""96748db757074358922b07a71e3b9954""public""0""public""d2d07b9926fb44cfb5f9cd0435c227b7""0"17"0""FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf"6020975"file"".pdf""1""2026-10-15T19:09:32.533+00:00""1d8671a5714f4ce8820f152d2fef3f3e""public""0""public""71e27f1dac194c0784e33e5eaef81d23""0"16"0""AZ BL COLO 7528(1) Burro Creek Road JOFOC_Redacted.pdf"273681"file"".pdf""1""2026-10-15T19:09:32.533+00:00""4bd4865447084538a8761752e7755fc1""public""0""public""6b483b32ab8c4d3fb09f1fbebdb9d3de""0"13"0""AZ BL COLO 7528(1) Burro Creek Road_FINAL HYD Report.pdf"37524346"file"".pdf""1""2026-10-15T19:09:32.533+00:00""f5e5d98b76bf432991a4240a73184ce6""public""0""public""d404e02ecbea414b8ea1c564aae802f9""0"12"0""AZ BL COLO 7528(1) Burro Creek Road_FINAL GEO Report and FINAL PVMNT Report.pdf"21016792"file"".pdf""1""2026-10-15T19:09:32.533+00:00""508e848c83104959a4d12cb145bc7d47""public""0""public""2edb2fb88dc6430faa7628a51db1613b""0"8"0""11.12.4 Design Physical Data and Reports.zip"71796"file"".zip""1""2026-10-15T19:09:32.533+00:00""e2da95ceab794ac585c74c98aa7423f1""public""0""public""fabf21f51d914220aa7c3419486c05d5""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d6f6fdca13254c15aa5780ecb43eee20), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.