We'll email you new goods & materials opportunities in Washington as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The purpose of Amendment 0001 is to provide answers to Offeror's J-5 Request for Clarifications Number 1-10.
This is a combined synopsis/solicitation for non-commercial products or non-commercial services prepared in accordance with (IAW) FAR/RFO 5.101, utilizing RFO Part 12 Procedures, RFO Part 15 Methodology, and RFO Part 18 Authorities. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Solicitation number N0040627R0004 is issued as Request for Proposal (RFP) for USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA).
This acquisition is not set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The North American Industry Classification System (NAICS) Code is 336611 (Ship Building and Repairing) and the Small Business Size Standard is 1,300 Employees. The Product Service Code (PSC) Code is J999 (Non-Nuclear Ship Repair (West)).
The Government intends to award a firm fixed price (FFP) standalone contract that meets the specifications outlined below. The proposed contract action is for non-commercial supplies for which the Government intends to solicit as full and open competition. Interested parties may identify their interest and capability to respond to the requirement and submit proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government.
The Government will award a contract resulting from this solicitation without discussions to the responsible offeror whose proposal, conforming to the solicitation that represents the best value to the Government, price, delivery, technical acceptability, past performance, and other factors considered.
QUESTIONS: Offerors may submit their questions regarding clarification of solicitation requirements to Bailey Butler by email at bailey.a.butler2.civ@us.navy.mil and Shawn Comparto by email at shawn.k.comparto.civ@us.navy.mil no later than two (2) calendar days prior to the proposal closing date and time. Any questions received after this deadline may not be answered.
Shipping terms shall be FOB Destination; therefore, proposal SHALL include ALL associated shipping costs, to include tariffs.
System for Award Management (SAM). Proposing vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://sam.gov/.
To be considered for this opportunity, all proposals shall be submitted via email or DoD SAFE in either Microsoft Word, Excel spreadsheet or Adobe PDF. Proposal must include price(s), FOB Destination, a point of contact, name and phone number, business size, and payment terms. An award will be made based on Best Value. Each proposal must clearly indicate the capability of the vendor to meet all specifications and/or requirements in the Statement of Work (SOW). Vendors shall provide a detailed (unpriced) capabilities statement for review and acceptance by the Technical POC. Responses to this solicitation are due by 0900 AM Eastern Daylight Time (EDT) on October 16, 2026.
Please email proposals or requests for DoD SAFE submission links to:
Bailey Butler: bailey.a.butler2.civ@us.navy.mil
Shawn Comparto: shawn.k.comparto.civ@us.navy.mil
Amber Hess: amber.e.hess3.civ@us.navy.mil
Proposals shall be valid for one hundred eighty (180) days from the submission date (at minimum).
Proposal packages shall contain the following information:
Official Company Name;
Point of contact including name and phone number; and
Cage Code number.
See attached solicitation for a list of line item number(s) and items, quantities, and units of measure.
The Point of Contact for this acquisition is Shawn Comparto, Contracting Officer.
Proposal packages are due by October 16, 2026 at 0900 AM Eastern Daylight Time (EDT).
The contractor shall perform planning, document preparation, engineering, procurement, prefabrication and shipyard production work necessary to accomplish repairs and alterations specified in the Work Item Specification Package (MSC AWP N0040626R0003). Work includes but is not limited to: management and procurement of contractor-furnished materials and resources; scheduling and progress measurement; quality control planning and procedures; preparation of heavy weather and cold weather plans; hazardous waste management; performance of inspections and certifications in welding, paint and coatings, safety, and non-destructive testing; hull preservation and painting; machinery space maintenance and overhaul; electrical system inspection and testing; cargo crane and winch inspection and refurbishment; lifeboat and rescue boat inspection; fire protection system testing; and calibration of electronic test equipment. The contractor must accomplish all work within the availability period (25 January 2027 – 15 March 2027) while accommodating scope increases up to 27% Over and Above work. The vessel will undergo dock trials and sea trials to verify proper functioning of repaired systems. The contractor is responsible for configuration control, material traceability, and interface with the Government's Principal Port Engineer and design control activities.
"98314-5100""BREMERTON""WA""USA""PUGET SOUND (FISCPS)""467 W STREET""2.1.3 J-5 RFC Answers Amendment 1.xlsx"594723"file"".xlsx""1""2026-10-02T17:41:53.006+00:00""d11647611855424583294c51d5333deb""public""0""public""fbf18cb0a90345509ca36629a4ffc2e1""0"16"0""2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf"2694028"file"".pdf""1""2026-10-02T17:41:53.006+00:00""cf04bb63e7214a61a85d96865c91ae8d""public""0""public""34229068ceb746948c70821cbe9abce9""0"15"0""2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf"589929"file"".pdf""1""2026-10-02T17:41:53.006+00:00""c9c6bd4399f0457887f304527014f9ae""public""0""public""25c1aa80cd594e82a407f16a049c6ca0""0"13"0""2.1.1 CDRLS DD 1423.pdf"2883027"file"".pdf""1""2026-10-01T20:37:08.254+00:00""eb93f9c8fc4741c7bd35ffab3df442d6""public""0""public""c939f041278c4c4db2e7c46abfc3f362""0"12"0""2.1.1 Solicitation - N0040627R0004.pdf"2693093"file"".pdf""1""2026-10-01T20:37:08.254+00:00""0deaf7d495dc40eeb58bb6fad3b1cac6""public""0""public""6ce6e715a6b54d258a2054253eb73cc9""0"11"0""2.1.1 J-7 MSC Ship Repair Facility Survey.pdf"452078"file"".pdf""1""2026-10-01T20:37:08.254+00:00""0f905c16930a4488a8d3abea536b1c1e""public""0""public""9ea96578f0b14652bf87295ac2de2060""0"10"0""2.1.1 J-1A WI Specification Package.pdf"413980"file"".pdf""1""2026-10-01T20:37:08.254+00:00""04c374b81a4f48a2b394d9a9e1ee71db""public""0""public""ceafabc2fb5f4ed3a4beb3fd7a3b6fac""0"9"0""2.1.1 J-2 GFP Attachment.pdf"236842"file"".pdf""1""2026-10-01T20:37:08.254+00:00""eca8bfd34a2147a5b7dda7b5aa51d47a""public""0""public""6cc4f5ffabc74b1ebe9420d246b55c8d""0"8"0""2.1.1 J-1B List of Work Items with OEM.pdf"251673"file"".pdf""1""2026-10-01T20:37:08.254+00:00""2f1f2cf343a847e2ad2d7a7f8bc42db3""public""0""public""500b08d1f5da4c7a938cb1e7e2c76705""0"7"0""2.1.1 J-6A Instructions Form W-14.pdf"144915"file"".pdf""1""2026-10-01T20:37:08.254+00:00""b5cc8bf946dc42bfb3aaf384016e2f7b""public""0""public""5222989a966e434693d8cc7dc7a27b7d""0"6"0""2.1.1 J-6 IRS FORM W-14.pdf"76404"file"".pdf""1""2026-10-01T20:37:08.254+00:00""fb092ae3356e427795175a6b50f834f8""public""0""public""6bea1d2a048d4db7b1ed0d7d31ab593f""0"5"0""2.1.1 J-8 Contract Administration Plan.pdf"61244"file"".pdf""1""2026-10-01T20:37:08.254+00:00""f20cd165512a45379995be92989afffd""public""0""public""7493096d7d4b4019bf7e4b0e3762baf5""0"4"0""2.1.1 J-3 Contractor Price Breakdown.xlsx"52171"file"".xlsx""1""2026-10-01T20:37:08.254+00:00""7bf9f9c5a6b54ba19a229127955262a9""public""0""public""242ce48065004b849b35084b9d5ce736""0"3"0""2.1.1 J-5 Request for Clarification.docx"31576"file"".docx""1""2026-10-01T20:37:08.254+00:00""962593c42e9849fba02be3b0199942ad""public""0""public""223f7df40a3a4703a918725790498aec""0"2"0""2.1.1 J-4 Contractor Past Performance Data Sheet.docx"29113"file"".docx""1""2026-10-01T20:37:08.254+00:00""f54732b8e87747389e3b3cfe6539d6fc""public""0""public""ede9f05f7f084ba09def80cfc2ee04aa""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice caeb9ce24694459682e0f7b70aee8c47), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.