MT BOZEMAN FTC CARPET REPLACEMENT (CONFERENCE ROOM)
Remove existing carpet, adhesive, tack strips and related materials throughout the approximately 567 sq ft conference room, inspect and prepare the subfloor including minor patching or leveling, protect adjacent finishes, furniture, fixtures and equipment, supply and install new low-pile modular tile carpet meeting sustainability and 7% biobased content requirements with compatible underlayment, transition strips and accessories, reinstall furniture, remove all waste, and leave the room clean, secure, level and ready for use.
We post new flooring opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140FF027Q0034.pdf"362604"file"".pdf""1""2026-10-27T20:50:40.979+00:00""c866d36bb1c5447b9b1f8bb4c206c80a""public""0""public""cfd27155a002491fa049555aec190448""0"3"0""Wage_Determination_2015-6027_Revision_6_2026-08-27_Gallatin_County_Montana.pdf"69922"file"".pdf""1""2026-10-27T20:50:40.979+00:00""50cc7fac68664b63b5388ebdd41674d2""public""0""public""7d1e7c14c2034dd0a63443467873bd5e""0"2"0""SOW_Carpet_Replacement_Conference_Room_BFTC.pdf"109968"file"".pdf""1""2026-10-27T20:50:40.979+00:00""4de79766f9f245cc899d601170e7a43f""public""0""public""50286d99f1074efc8a3c2ee21df789c6""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c85014dcfe4e44b68a4afa78415160d4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.