Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project
Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project
The contractor engineers, procures, constructs and commissions in-kind replacement series capacitor banks at the Maxwell, Tracy, Olinda South and Olinda North sites, including breakers, motor-operated disconnect and ground switches, protection and control, foundations and platforms as needed, bird repellant systems, factory and field testing, and training of WAPA personnel.
We post new electrical opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""95630""FOLSOM""CA""USA""114 PARKSHORE DRIVE""https://www.fedconnect.net/FedConnect/?doc=89503326RWA000049&agency=DOE"0"link""1""2026-03-12T13:27:38.157+00:00""2efce17212974022ab7df22e75560c40""public""0""Click here to see more information about this opportunity on FedConnect""public""f09b25b866844d3ab04273c6a7859487""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c4328e231e394520afdb0e748e8072ce), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.