P-210 Electrical Power Plant at Chabelley Airfield, Djibouti
Please see attachments.
Revised notice provided with updated site visit date and anticipated posting date.
The project will construct a power plant with six 830 eKW diesel generators (1,038 KVA, 4,160V) running on ultra-low sulfur diesel with an operational bypass for regular diesel fuel, meeting the Overseas Environmental Baseline Guidance Document. The work includes two fuel storage tanks, a fuel polishing system, fuel offloading and distribution, diesel exhaust fluid offloading with conditioned storage and distribution, and a steel-framed metal canopy over a concrete slab encompassing a fuel-offloading system with concrete containment and an adjacent prefabricated control facility. An automated generator control system with optional manual override will be installed. The primary electrical distribution system includes underground electrical infrastructure, substation switchgear housed in a separate prefabricated facility, a paralleling programmable logic controller system, underground PVC conduit in concrete-encased duct banks integrated into existing secondary distribution centers, a medium-voltage pad-mounted switchgear, and a pad-mounted transformer.
We post new electrical opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23508-1278""NORFOLK""VA""USA""6506 HAMPTON BLVD""P210 Presolicitation Revision 1.pdf"100959"file"".pdf""1""2026-11-12T20:30:01.627+00:00""148276ef623f444bac50e8dec168c19d""public""0""public""1f67a7f36eae415ca4060f15e758a857""0"3"0""Attachment_A_Base Access Memo.pdf"164712"file"".pdf""1""2026-10-21T17:58:44.505+00:00""66f0da5040ad4aa899beae5dff3cbbda""public""0""public""c6d5af3297c74febbd9358861eff81e2""0"2"0""P210 Presolicitation.pdf"99928"file"".pdf""1""2026-10-21T17:58:44.505+00:00""2c7f06719925457c84246eb9bb53c24b""public""0""public""576f66346d7c4172af0f4af7b3d38cb8""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 13bc9e33204f4b80983d778a742b2add), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.