Wild Horse and Burro Adoption Office-Blackwater Cleanup and Restoration
The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to perform cleanup and restoration. Work includes: Task 1 – Site Assessment and Hazard Controls; Task 2 – Blackwater Removal and Extraction; Task 3 – Removal of Damaged Materials (approx. 600 sq ft sheet rock, 80 linear ft vinyl baseboards, 100 linear ft wood baseboards, 100 sq ft vinyl flooring); Task 4 – Cleaning, Sanitizing, and Disinfection of all surfaces; Task 5 – Dry-Out and Environmental Stabilization; Task 6 – Restoration and Repairs (replace drywall, flooring, base trim, repaint, reinstall fixtures, seal shed access points); Task 7 – Final Inspection and Clearance (contractor-provided clearance testing for surface and air sampling). The contractor must also remove, clean, and sanitize salvageable furniture and office equipment, dispose of porous items, and store cleaned items onsite.
We post new waste management opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140LL027Q0029_Amd_0002.pdf"234671"file"".pdf""1""2026-11-24T16:25:11.965+00:00""cfdae3d2cf4d43d79a310ed74f907cf3""public""0""public""53e1ddf6bbb04d6f97a528635b3008bc""0"4"0""Sol_140LL027Q0029_Amd_0001.pdf"215129"file"".pdf""1""2026-11-23T16:49:13.268+00:00""4607a301ebe64b3c883217d886130c6f""public""0""public""bc1a186cddfa4b888c8c7aecf002b782""0"3"0""Sol_140LL027Q0029.pdf"535974"file"".pdf""1""2026-11-16T20:18:39.188+00:00""90c96e6fa1634ae79931fa6f5d6c7bea""public""0""public""b81c733c64e64e51a9e9ebb9931e99a5""0"2"0""B03_Wage_Determination_SAM_gov.pdf"480424"file"".pdf""1""2026-11-16T20:18:39.188+00:00""9c2c371661724c8cbe6ab1de1caa335a""public""0""public""b87dddb494da4095946abe6695a035de""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c41036dc931544abb1d11ab2034e6158), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.