M&R MACC
Only M&R MACC Contractors listed on the General Requirements cover page may submit a propsal for this ROICC Camp Lejeune area of responsibility project. See attached dcocuments for scope of work and any applicable drawings.
The contract encompasses fence construction at AS3507 on Marine Corps Base Camp Lejeune. Work shall be located at the building and/or area described in the attached project description, with the exact location indicated by the Contracting Officer. The contractor must notify the Contracting Officer's Representative (COR) 48 hours prior to starting excavation work and shall verify the elevations of existing piping, utilities, and underground obstructions using professional utility locators with electromagnetic or sonic equipment. The facility/activity will remain in operation during the entire construction period, and the contractor shall have access to the work area for the contract duration. Regular working hours are 0730–1600, Monday through Friday, excluding government holidays. Work outside regular hours requires COR approval with at least 15 calendar days written notice. The contractor must comply with all existing work protection requirements, environmental regulations, cultural resource protections, and DBIDS access requirements. The project is subject to prevailing wage requirements, liquidated damages at $157.35 per calendar day, and completion within 180 days of award.
We post new fencing opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""MAXIMO Initial Equipment Inventory and Replacement.pdf"97695"file"".pdf""1""2026-10-27T16:27:50.872+00:00""91c6e930c9c14ab2baba596374309575""public""0""public""28c237956e154494ad888418b615e0f7""0"6"0""Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf"4702540"file"".pdf""1""2026-10-27T16:27:50.872+00:00""daff10ab404f40039d068bbf45caf3bf""public""0""public""814dc090817b409097dc3681338b6738""0"5"0""Combined DIV 01 specs small projects.pdf"568081"file"".pdf""1""2026-10-27T16:27:50.872+00:00""9cef5d1c624a46bca0a4a0986c72a52f""public""0""public""0d4bac7c23254d308103a210320e38a1""0"4"0""26-0437 AS3507 FENCE - SUBMITTAL REGISTER.pdf"63826"file"".pdf""1""2026-10-27T16:27:50.872+00:00""78008932b21e4eaca4cbaa00f0095fd1""public""0""public""ef6b58fc02484753b2563492ab3bcfd9""0"3"0""26-0437 AS3507 FENCE - SOW.pdf"1340630"file"".pdf""1""2026-10-27T16:27:50.872+00:00""e270dd6130f943ca83d9d0ba0c7a75d7""public""0""public""46b35b4399e5491d9c64293555e623e8""0"2"0""RFP AS3507 Fence.pdf"111565"file"".pdf""1""2026-10-27T16:27:50.872+00:00""3e25f4cb8b0b4fb5a9211966f9824911""public""0""public""b98934b78d6e47418dbb49aeb2abf438""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c31d7a65eb7f474db5b18acf544f6652), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.