This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR Subpart 12.6. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quote (RFQ).
The contractor must remove and dispose of obsolete components and install a modern, non-proprietary microprocessor-based control system for four hydraulic passenger elevators, replacing the existing TKE TAC-20 controllers with solid-state microprocessor controllers and VFD drives. Work includes new wiring packages, selector systems, pit safety switches, door operators and reopening devices, car operating panels, hall stations and lanterns, and integration of hoistway serial boards. The contractor must retain and reuse the existing hydraulic power unit, jack assembly, cab shell and flooring, and hoistway door panels. Upon completion, the contractor must perform a Full-Load Safety Test, coordinate final inspection with the AHJ, provide three sets of laminated as-built wiring diagrams, and provide at least two hours of on-site training to FCC staff.
We post new electrical opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""39194""YAZOO CITY""MS""USA""PO BOX 5666""NCIC Form.pdf"626281"file"".pdf""1""2026-10-20T17:01:42.774+00:00""8e5899500e7a41279f8017bf8564fdd7""public""0""public""432af595099c4a3ab31559d65fa8e1cd""0"3"0""Update Elevator SOW.pdf"2486669"file"".pdf""1""2026-10-20T17:01:42.774+00:00""1ed6731adb104b34a4b965ecb28a594d""public""0""public""5755e3869e9940c6b3a1f7ff855b44e0""0"2"0""Combined Synopsis.pdf"114582"file"".pdf""1""2026-10-20T17:01:42.774+00:00""09cd063952714468a0bb9ed8d1b43166""public""0""public""1fe47a4864c74b598f20d29b511bfef9""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice bc4f15d45f384245b30617ee5e343ed9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.