This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.
Solicitation number 47PF5327Q0001 is issued as a request for quotation (RFQ) for Elevator Maintenance & Related Services.
This acquisition is not set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
(i) Reference Attachment B, Electronic Offer Sheet for a list of line-item number(s) and items, quantities, and units of measure (including option(s).
(ii) Reference the Performance Work Statement for a description of requirements for any items to be acquired in performance of this requirement.
(iii) Contemplated Period of Performance one year base period (March 1, 2027 to February 29, 2028) and four one-year options and the option to extend. The location of performance is at the Kinneary US Courthouse in Columbus, OH, Bricker Federal Building in Columbus, OH, Bricker Parking Garage in Columbus, OH, and Rice Federal Building & US Courthouse in Dayton, OH.
(iv) Reference the Terms and Conditions of this solicitation for a list of solicitation provisions that apply to the acquisition.
(v) Reference the Terms and Conditions of this solicitation for a list of the contract clauses that apply to the acquisition.
(vi) Solicitation Deadlines:
Question Deadline: November 3, 2026, 3:00PM EST
Quote Deadline: November 16, 2026, 3:00PM EST
Questions and Quote Shall be Submitted to: Natasha Cunningham, Contracting Officer at natasha.cunningham@gsa.gov
(vii) Contracting Officer Point of Contact:
Natasha Cunningham, 201 Superior Ave, Cleveland, OH 44114, natasha.cunningham@gsa.gov
(viii) Services codes:
North American Industry Classification System (NAICS): 238290, Other Building Equipment Contractors, with a size standard of $22 million. The product and services code (PSC) is Z1AA Maintenance of Office Buildings Services.
(ix) Site Visit:
Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A site visit is scheduled for October 26 and 27, see Appendix C.
(x) Evaluation will be conducted in accordance with FAR 52.212-2 (GSA Class Deviation RFO-2025-12) and FAR 12.203 (GSA Class Deviation RFO-2025-12).
The contractor shall provide full elevator maintenance service in compliance with ASME Safety Code requirements, manufacturer's recommendations, and all applicable codes. Full maintenance service includes all services, repairs, inspections, and testing necessary to maintain all elevators, appurtenances, and accessories in a fully operational mode at all times except for pre-scheduled downtime, including all labor, parts, and materials. The contractor must provide all tools, equipment, supplies, and personnel necessary for safely performing all tests required by the ASME A17.1 Safety Code for Elevators and Escalators and A18.1 Safety Standard for Platform Lifts and Stairway Chairlifts, including inspections and tests required at six-month, one-year, three-year, and five-year intervals. The contractor must also provide elevator emergency telephone monitoring services 24/7, respond to routine service calls within two hours, and respond to emergency call-backs within thirty minutes. The contractor must develop and implement a Maintenance Control Program (MCP) and a Quality Control Plan (QCP). The contractor is responsible for all costs associated with repairs and replacements including labor, equipment, materials, supplies, and subcontracts. The contractor must have qualified personnel onsite 5 hours weekly (minimum 2 days) at each location during normal working hours.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Appendix C - Attendance Form.pdf"178033"file"".pdf""1""2026-10-19T16:39:54.328+00:00""3aaebd2355be4f84ab904dff94ce0154""public""0""public""4618de14070f4025bfeaa0b843075ab7""0"13"0""Appendix B - Past Performance Form.pdf"171064"file"".pdf""1""2026-10-19T16:39:54.328+00:00""80c635e3f40b49cb9bbf7317f3d05fa1""public""0""public""1e30dfb6e0ed4b89b810f020470efa91""0"12"0""Appendix A - CCW Rice.xlsx"17291"file"".xlsx""1""2026-10-19T16:39:54.328+00:00""17efa32d5c0e445bbf304e8ca3919867""public""0""public""3f583f76985444b8a9b269a95d7b15a5""0"11"0""Appendix A - CCW Kinneary.xlsx"17267"file"".xlsx""1""2026-10-19T16:39:54.328+00:00""ea61567dc7794966812b033999fb8647""public""0""public""0b2995b811884365a8df2a6c63ad6aa0""0"10"0""Appendix A - CCW Bricker Garage.xlsx"17302"file"".xlsx""1""2026-10-19T16:39:54.328+00:00""a7935462765e441e899df12e4c774f59""public""0""public""b45c1b053aa04abc8c31fb4315d305b9""0"9"0""Appendix A - CCW Bricker FB.xlsx"17358"file"".xlsx""1""2026-10-19T16:39:54.328+00:00""e0f067f7f0954c90891a6b8efc893309""public""0""public""4ca10268c15849a5817346db4d4d22c2""0"8"0""Attachment C - IUEC -2026 Wage Rates Local 37 Columbus.pdf"582474"file"".pdf""1""2026-10-19T16:39:54.328+00:00""ffc2d64e3c8841b0a771fb79209e72b6""public""0""public""4e2d590cf8754f07a5dc825890aa9ef3""0"7"0""Attachment C - IUEC -2026 Wage Rates Local 11 for Dayton.pdf"582756"file"".pdf""1""2026-10-19T16:39:54.328+00:00""ac04d64538dc4c5986486290896c2306""public""0""public""7a47c22f3a104740816cd033ea27d298""0"6"0""Attachment C - 2022-2027-NEBA-Agreement.pdf"550251"file"".pdf""1""2026-10-19T16:39:54.328+00:00""51a39a24af8149edb7ff8d12265da1de""public""0""public""28ed70a6a1bb4a379963ca7335fad7d6""0"5"0""Attachment B - Electronic Offer Sheet.xlsx"140267"file"".xlsx""1""2026-10-19T16:39:54.328+00:00""8e27c3f05e1b434b889163e211cff9bd""public""0""public""57bc9983d2f14bd1bf4e62a6db669c79""0"4"0""Attachment A - PWS.pdf"1599464"file"".pdf""1""2026-10-19T16:39:54.328+00:00""23775772783d40fc845ce285997566a3""public""0""public""3e8e4603dd4d44a6bc77d7097e4e3ac2""0"3"0""SF 1449 47PF5327Q0001.pdf"1976420"file"".pdf""1""2026-10-19T16:39:54.328+00:00""bd8af9d63c314e4e9747a7f522315fcc""public""0""public""44fcbe42e8de4c0aa317051b12796e28""0"2"0""RFQ 47PF5327Q0001.pdf"949610"file"".pdf""1""2026-10-19T16:39:54.328+00:00""fa05ed8ba95d42eba0fb34cebe7d8d87""public""0""public""4c26d6b3cef140068a4dc7c65c062616""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7682e80bbf9c4132b9afc0a748a841bf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.