We post new flooring opportunities in Minnesota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all quantities and conditions prior to installation; any discrepancies must be reported to the COR immediately.
No substitutions for specified products without CO approval. Work shall be performed in full accordance with the technical specifications including, but not limited to: Sections 00 01 15, 01 33 23, 01 35 26, 01 45 00, 01 57 19, 01 74 19, 02 41 00, 02 82 13.19, 07 84 00, 09 05 16, 09 65 19, 09 68 00 (demo only), and 09 91 00 (touch-up painting). The Contractor shall execute all work in accordance with the VA provided phasing drawings and written direction, including the sequencing for Buildings 2, 1, 28, and 29.
No deviations from the approved phasing shall occur without written approval from the COR and CO. Each building shall be fully completed before mobilizing to the next, unless otherwise directed in writing. POP: 565 days after NTP
The contractor shall remove existing flooring and install new resilient flooring and base in occupied healthcare facilities, complying with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Work includes field-verifying all quantities and conditions, executing work per VA-provided phasing drawings for Buildings 2, 1, 28, and 29, and completing each building before mobilizing to the next. The contract duration is 565 days after NTP, with normal working hours of 8 am to 4:30 pm Monday through Friday, excluding Federal Holidays, and off-hours/night work is required.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice b5a45da3712540eeabdcbf17140d4cb5), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.