We post new flooring opportunities in Nebraska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions.
The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval.
The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials.
The project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1 on the 3rd and 2nd Floors. All measurements/dimensions from existing blueprints are approximate and the contractor must verify all measurements/dimensions. The contractor shall inspect the area under contract prior to commencing work, identify any pre-existing damage, and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The contractor shall match existing conditions at each location and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials.
"US""55101""Saint Paul""MN""USA""316 Robert Street N""Suite 506""36C26326B0036_IFB_Rplc CLC Flooring_GI.pdf"695571"file"".pdf""1""2026-08-02T19:32:13.115+00:00""8a94c50a367d4fe2a7b925329376695a""public""0""public""1fa6c72b256742e59407feb70b3a34db""0"22"0""Final SOW_636-26-502_GI Flooring.pdf"481346"file"".pdf""1""2026-08-02T19:32:13.115+00:00""c8d3588b561d42438aaa75c02986bb04""public""0""public""c14780c0c3e34e77b061fd120ee8da49""0"17"0""NARA Mgt_TMS 20939 No Access FY24_Emplys Read-Sign.pdf"64003"file"".pdf""1""2026-08-02T19:32:13.115+00:00""592a19ef0cd1464f832ee9165d7b8b23""public""0""public""28f078926e814596bc588501cfce37de""0"13"0""Drawing_GRI 2nd-3rd Flrs_Rplc Flooring.pdf"1131584"file"".pdf""1""2026-08-02T19:32:13.115+00:00""0a1dca2951094df9a14648191842f395""public""0""public""d209d985f4d54ad2b99655664e93be07""0"10"0""VAAR 852.219-75_VA Notice of Limitations on Subcontracting.pdf"136641"file"".pdf""1""2026-08-02T19:32:13.115+00:00""43205458b3ab463db633c8c30e33aa7b""public""0""public""8017d69e9a1d4fb7aae5f8a0ed34ffa1""0"8"0""WD NE20260047_636-26-502.pdf"2143085"file"".pdf""1""2026-08-02T19:32:13.115+00:00""16e4a2d44a61445bafad08f572cd0d8b""public""0""public""57acb2bd1fa649ee8aa1c8d7d0e93496""0"7"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 99f0f45aea244c3fb657194fdd96b29a), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.