(i) This is a combined pre-solicitation notice/solicitation for commercial products or commercial services prepared in accordance with the format in Subpart 12 and additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.
(ii) Solicitation number 140RR027Q0013 is issued as a Request for Quote (RFQ). NOTE: Previous solicitation number 140R2026Q00116 is being replaced with a new solicitation number 140RR027Q0013.
(iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 as of March 13, 2026, and Federal Acquisition Regulation (FAR) Overhaul.
(iv) This acquisition is a total small business set aside. The NAICS code is 561621 and the size standard is $25.0 million.
(v) The contract line items are listed in the price schedule of the solicitation package.
(vi) This requirement is for Fire Alarm Maintenance Services represented in the Statement of Work.
(vii) Period of Performance: February 1, 2027 through January 31, 2032.
(viii) The provision 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services, applies to this acquisition. The quote package will consist of the vendor's pricing information.
(ix) The provision 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition. Refer to this provision for information.
(x) The clause 52.212-4, Contract Terms and Conditions -Commercial Products and Commercial Services, applies to this acquisition. There are not any addenda to this clause.
(xi) All additional contract clauses and provisions are included in the attached solicitation package.
(xii) The Defense Priorities and Allocations System (DPAS) do not apply to this acquisition.
(xiii) Quotes are due November 25, 2026, by 10:00 AM Pacific Standard Time and should be emailed to mouang_phan@ios.doi.gov.
(xiv) The point of contact is Mouang Phan email at mouang_phan@ios.doi.gov.
The Contractor shall inspect, test, repair, and document maintenance activities in accordance with NFPA 72 for fire alarm systems at ten locations (Shasta Powerplant, Shasta Dam, Upper Vista House, Shasta Maintenance Center, Keswick Office Building, Keswick Powerplant, Spring Creek Powerplant, J.F. Carr Powerplant, Lewiston Powerplant, Trinity Powerplant). Work includes monthly, semiannual, and annual inspections and tests; routine corrective maintenance (replacement of detectors, strobes, pull stations, batteries, etc.); non-routine repairs (circuit failures, component malfunctions, central monitoring station issues); and maintaining a baseline schedule. The Contractor must stock minimum replacement parts and use Siemens-certified technicians for repairs. The contract also requires compliance with Reclamation Safety and Health Standards and submission of a written safety program.
We post new professional & consulting services opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140RR027Q0013.pdf"177575"file"".pdf""1""2026-10-27T21:35:32.455+00:00""5f91062a595746ef8746d9148a36874d""public""0""public""829c1c8d777a45febca43121e8a17c49""0"7"0""C5_5__Attch_2_Major_Fire_Alarm_System_Components.PDF"2663708"file"".pdf""1""2026-10-27T21:35:32.455+00:00""f21074b46b1c41f1818e06047a775728""public""0""public""f1e402fa2a7547e1bdc42e6a293a31a6""0"6"0""C5_5__Attch_5_Wage_Determination.pdf"4352637"file"".pdf""1""2026-10-27T21:35:32.455+00:00""2577e719f5774ef8900119dc3efe5e3d""public""0""public""f550bcbf86d4435e84f8c745207962f3""0"5"0""C5_5__Attch_4_RSHS_Appendix_1_03-C_Safety_Program.pdf"219866"file"".pdf""1""2026-10-27T21:35:32.455+00:00""b7ca4f1b24cc44099b528975d949413a""public""0""public""a3e8158c8302437c99ab23a0673b80ef""0"4"0""140RR027Q0013_Combined_Pre-Sol_Notice_Sol.pdf"610508"file"".pdf""1""2026-10-27T21:35:32.455+00:00""bfcfb70629fb4d2c8794b0e95955815c""public""0""public""737328b6fd5f4bcfbaa7ffd6bd0541ca""0"3"0""C5_5__Attch_1_Fire_Alarm_Reporting_Diagram.PDF"371908"file"".pdf""1""2026-10-27T21:35:32.455+00:00""1d410b46a67040bea5e62a95a5fe2c96""public""0""public""65f3ec9483bb4c1caada633855dc9967""0"2"0""C5_5__Attch_3__Inspection-Testing_List.pdf"401546"file"".pdf""1""2026-10-27T21:35:32.455+00:00""cfc22289f3a24d1dbb856510eefa3760""public""0""public""c8c58db819584048b99f7c3ed275aabf""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b11d3623d84843b2899857e45ac20464), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.