Replace failed condensate pump with a new efficient pump
Replace condensate pump and pump’s components to restore efficiency to the steam/condensate systems.
The contractor must secure steam to the building and lockout/tagout the steam system, performing this work on a Saturday. The existing condensate pump and receiver must be removed and disposed of in a metal recycle dumpster, and a foundation prepared for the new equipment. A new steam condensate pump and receiver skid must be installed, equipped with a gauge glass, steam pressure gauge, check valves, steam regulator, trap y-strainer, and pressure gauges, with metal components of Schedule 80 pressed or forged steel and a self-contained ASME-rated, insulated receiver. New connections for inlet, outlet, steam inlet, vent, equalizing line, and pump drain must be furnished, along with a new pressure reducing station on the steam supply, and the overflow re-piped to a floor drain. The steam system must then be cleared of lockout/tagout, checked for leaks, and tested for proper operation before equipment jacketing is installed.
We post new plumbing opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""90815""LONG BEACH""CA""USA""4811 AIRPORT PLAZA DRIVE""SUITE 600""Qts and Answers with photos for RFQ 36C227Q0089 Condensate Pump.docx"1883802"file"".docx""1""2026-11-18T22:56:05.406+00:00""a54b22892dc5496b8e97c275b298b26b""public""0""public""b601d91952ac405c9d6fa14ad81aa3e3""0"6"0""RFQ 36C26227Q0089 Amendment 2 QA date ext.pdf"188168"file"".pdf""1""2026-11-18T22:56:05.406+00:00""76407f1f8c0d46a0a99d0eaa31c4bda3""public""0""public""b357e436d9e4495394aaf60c62b8de47""0"5"0""Amendment 1 Site visit date extension 36C26227Q0089 0001.pdf"183522"file"".pdf""1""2026-11-16T21:07:07.979+00:00""39b6719f38ce4429aec61e32b16d7275""public""0""public""c90faac1e3854c2baaf00c6ca1c19a66""0"4"0""S02 RFQ Replace Pressure Pump Sepulveda 36C26227Q0089.pdf"567115"file"".pdf""1""2026-11-10T20:35:22.827+00:00""4ca2bbec885849bf964591c332bcad40""public""0""public""b7b8102e176b46cf9b9b12bc48613599""0"3"0""S02 Contract Opp Sepulveda Replace Pump.pdf"132935"file"".pdf""1""2026-11-10T20:35:22.827+00:00""0e94418df00146d09c84452f5164fa06""public""0""public""c6209948ff7644a9b421c78714fd7925""0"2"0""Solicitation description Replacement of Condensate Power Pump.docx"13863"file"".docx""1""2026-11-10T20:35:22.827+00:00""10c0bbdcdd614a19a4762a16f196243b""public""0""public""9b5cb8021a5747418c0df62dae4c1eeb""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b09541b11a924f7f9b36cdc248c8ec4a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.