550-26-121 Emergent Repairs North Water Tower 71 & South Water Tower 94 CON
The contractor shall provide all labor, material, supplies, equipment, management, supervision, and all other resources to upgrade and repair the north water tower in accordance with plans and specifications. The south water tower work is included under individual tasks for the base bid. The project entails excavation and soil shoring for structural foundation repairs in addition to correcting OSHA deficiencies from an existing assessment provided by the VA. Specific tasks for the south water tower include: installing a thermometer, replacing the manway, installing a new screen on the overflow pipe, removing co/ax cable from the ladder, adjusting windage rods, installing cable type ladder safety devices, cleaning and lubricating the liquid level indicator, installing an OSHA compliant interior bowl access ladder, installing a safety grill, abrasive blasting and applying an epoxy liner to the interior of the tank, drilling additional weep holes on the balcony floor, installing signage, and performing a water test. The period of performance shall be 135 Calendar Days after issuance of Notice to Proceed.
We post new excavating opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""S02 Solicitation 36C25227B0008_1.docx"306524"file"".docx""1""2026-11-23T20:09:03.885+00:00""b2fcac29221e470ea00bc2eacd67bb28""public""0""public""28d927a3312e466eb28ba5db52fe7463""0"6"0""Attachment 4 - Wage Determination 550-26-121CON.pdf"105957"file"".pdf""1""2026-11-23T20:00:00.372+00:00""ec79d98c70ed40dfbfc71957d428e932""public""0""public""4f13cdb41429489ba092f96dc7221540""0"5"0""Attachment 3 - 550-26-121 Bid Documents Project Manual - Specifications.pdf"4971219"file"".pdf""1""2026-11-23T20:00:00.372+00:00""c2097712f64d471fbc29ac258e7fc219""public""0""public""bd4873014316465b9733414284bdd01b""0"4"0""Attachment 2 - 550-26-121 Bid Documents Drawing Set.pdf"15611449"file"".pdf""1""2026-11-23T20:00:00.372+00:00""5c4f2c0ccdcf4c4d8f9349e7694cb16a""public""0""public""6019281cd91c4988b8d357fd91363b1a""0"3"0""Attachment 1 - 550-26-121 SOW.pdf"98253"file"".pdf""1""2026-11-23T20:00:00.372+00:00""33c3d07d2642455b8ade7a2533fdf659""public""0""public""a73607b5f3e5467eb4db7d9611bbe87a""0"2"0""36C25227B0008_1.docx"86377"file"".docx""1""2026-11-23T20:00:00.372+00:00""c9f0a5990ebe418e853e755cb363927b""public""2026-11-23T20:09:03.885+00:00""1""public""3b9412dc90e347c1a7f8523362e6fe0c""0"1"0""2026-11-23T20:09:03.885+00:00"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0d0c1323c76e4ed5a24427a461b9f25d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.