Project No. 583-22-106 - Replace Electrical Panels & Expand Distribution
The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, permits, temporary facilities, temporary power systems, temporary generators, fuel, preliminary testing, commissioning, startup, programming, integration, demolition, restoration, final testing, and incidentals necessary to provide a complete, safe, tested, commissioned, and fully operational project. Work includes demolition and removal of existing primary and secondary electrical distribution equipment; installation of new primary and secondary electrical distribution equipment, unit substations, switchgear, switchboards, panelboards, transfer switches, disconnect switches, circuit breakers, conductors, raceways, panels, controls, and associated infrastructure; installation of underground electrical duct banks, manholes, site electrical utilities, site restoration, stormwater-related work, concrete work, and associated civil improvements; architectural, structural, mechanical, fire alarm, access control, security, and controls work required to support the electrical distribution upgrades; temporary power systems required to maintain continuous Medical Center operations; electrical controls integration including PLC programming, HMI development, communication setup, network configuration, software backups, testing, startup, commissioning, and final operational verification and training; fire alarm modifications, programming, testing, monitoring coordination, and acceptance testing; and restoration, patching, firestopping, cleaning, labeling, documentation, training, commissioning, and closeout activities.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""Attachment VI - JA.pdf"405589"file"".pdf""1""2026-11-05T15:32:18.786+00:00""4c11b201206e4e8f950ac30edc3d5ece""public""0""public""aaad2aa7d0d84b00878ba5fcd672648e""0"7"0""Attachment V - RFI Form.pdf"103998"file"".pdf""1""2026-11-05T15:32:18.786+00:00""61ebb98c1b4641848169bb58eceecc3c""public""0""public""ab37cf6f00b1425bb61e40c15ad27f03""0"6"0""Attachment IV - VAAR 852.219-75.pdf"193605"file"".pdf""1""2026-11-05T15:32:18.786+00:00""91516e45d1494d188b947641fe48eed2""public""0""public""45a210809f7b4e57ad0747f7964ab039""0"5"0""Attachment III - Drawings.pdf"18958472"file"".pdf""1""2026-11-05T15:32:18.786+00:00""9bf2e354050041cf83bf6dc07e81a90d""public""0""public""12685f5034af42f98b72f8b62ca44964""0"4"0""Attachment II - Specifications.pdf"17460711"file"".pdf""1""2026-11-05T15:32:18.786+00:00""8c00e8ff636140f5a940b73d01e9439c""public""0""public""52312ea868e944f8b7a93c6d5bf534e1""0"3"0""Attachment I - DBA WD.pdf"89567"file"".pdf""1""2026-11-05T15:32:18.786+00:00""533ec5343a6a4ba8ac1c20c3c8182223""public""0""public""6fd1b71af14b415b922c489cc6896c55""0"2"0""36C25027B0002_1.docx"168271"file"".docx""1""2026-11-05T15:32:18.786+00:00""42d5026497b34a9f9bc423d30f84e7c1""public""0""public""b763829f3ad240f09e134e4bb5655dce""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ac2197d5c69b4bc18a7cb7f58089ede3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.