Argonne National Laboratory (ANL) seeks a Supplier to design, fabricate, deliver, support installation, and commission a custom industrial furnace for R&D testing of fuel-flexible burners using natural gas and hydrogen blends from 0–100% H₂.
The furnace shall support direct-fired and indirect-fired burner configurations and meet all requirements in the attached Statement of Work, including performance, facility interfaces, applicable codes, and safety requirements.
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Technical acceptability will be evaluated on a pass/fail basis. Among responsible offerors determined technically acceptable and compliant with solicitation requirements, ANL will award to the offeror with the lowest evaluated price.
Offerors shall submit:
Completed and signed ANL-70 Request for Quotation.
Technical compliance response addressing each Statement of Work requirement, with supporting evidence.
Country of Origin information for the furnace and major components.
Lead time from PO through final delivery, FOB Destination, Lemont, IL 60439, including major design, fabrication, delivery, and commissioning milestones.
Completed and signed ANL-70B Representations and Certifications.
Any proposed exceptions or deviations.
Offers that do not meet mandatory requirements or do not provide adequate supporting documentation may be found technically unacceptable.
Country of Origin shall be provided in accordance with FAR 52.225-1, Buy American—Supplies. Please direct questions to the Contracting Officer. Thank you in advance for your participation.
The Supplier shall design, fabricate, deliver, support installation, and commission a custom industrial furnace that meets the performance, functional, and compliance requirements stated in the Technical Specifications. The scope includes the furnace, adaptable burner bung, furnace access door, refractory/insulation, cooling tubes, optical ports and windows, instrumentation ports, exhaust flue, and associated interfaces with the existing laboratory facility. The furnace shall support direct-fired and indirect-fired burner configurations. The Supplier shall also provide documentation including design drawings, a 3D CAD model, an Operation & Maintenance Manual, and a commissioning report.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60439""Lemont""IL""USA""9700 S. Cass Ave""ANL-70 Request for Quotation.doc"256512"file"".doc""1""2026-10-29T19:56:19.885+00:00""e0a0d47be26b4475bacc7ecbc2783bf5""public""0""public""dd9a69391fe6480bbf92098985631ea9""0"17"0""SOW.docx"2214544"file"".docx""1""2026-10-29T19:56:19.885+00:00""0816548598ed444888a244e2f9c8c6ce""public""0""public""d96986e95946407d8fb37badbda8e14a""0"16"0""ANL-70B Reps and Certs Long-29-SEP-2026.PDF"416907"file"".pdf""1""2026-10-29T19:56:19.885+00:00""a454f5aaf4224b3ca05aa3168013e9eb""public""0""public""43b04b6609dd41c58cfa97b06bff3cbf""0"15"0""Appendix A-71COM-15-OCT-2026.PDF"520838"file"".pdf""1""2026-10-29T19:56:19.885+00:00""cbb17db9906a4562ba07f8328a071ad9""public""0""public""e56bd297f01a461d991fd237fb37ee63""0"14"0""ANL-366H (on-site high risk)-23-OCT-2026.PDF"339950"file"".pdf""1""2026-10-29T19:56:19.885+00:00""f2b508ddb8424a52afd5a826bea11f29""public""0""public""165cefc88027435b9a84945b56207486""0"13"0""Appendix D8C-12-DEC-2023.PDF"159504"file"".pdf""1""2026-10-29T19:56:19.885+00:00""63f8488e3fbe443796e86bc587e0b209""public""0""public""5e1f7d93084f47d080ba7752d3b9357e""0"4"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice a453b5522b5c4c73a6b3bf75f1d2cbf0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.