The Rock Island Arsenal has a requirement for the following item.
The Government intends to make a firm fixed price (FFP) award to the lowest priced, responsive, responsible vendor whose quote, conforms to the RFQ requirements and represents the lowest total evaluated price. Discussions are not anticipated.
Payment will be completed via Wide Area Work Flow (WAWF)
Quote must include shipping to Rock Island Arsenal, IL 61299
Site Visit is set for November 10th, 2026 at 10 AM Central Standard Time
Quotes are due by 6 PM, November 27, 2026
Certificate of Conformance in required
The contractor shall furnish and deliver a complete, stationary, top-loading electric deep pit furnace, including all necessary components for a fully functional system. The furnace must have a work zone of at least 60 inches diameter by 144 inches depth, an operating range of 1500-1850°F, and be capable of holding loads up to 10,000 lbs. It must include a pneumatic lift and swing-rotate door assembly, electric heating system with metallic-resistant elements in radiant tubes, atmosphere control systems for carbon-neutral atmospheres and gas carburization, a complete pyrometry and control system with an Allen Bradley Micro850 PLC and PanelView HMI, and a lid-mounted atmosphere recirculation fan. The contractor is responsible for all site inspections, preparation, installation labor and materials (except utility connections to points of first connection), off-loading and placement, set-up, and commissioning. The contractor must also provide operator training for 5 personnel, programmer training for 2, maintenance training for 2, and methods training for 4, as well as a verifiable service/repair capability with 48-hour on-site response.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""Solicitation - W519TC27QA019.pdf"12357394"file"".pdf""1""2026-10-30T15:14:53.245+00:00""d921e884c9054410b6ffb279ffe300ad""public""0""public""30f02c63643249188c964decb6902232""0"4"0""Solicitation - W519TC27QA019.pdf"11782640"file"".pdf""1""2026-10-27T20:12:20.077+00:00""8b6d24bc1cc2436cbe3cabea6c441335""public""2026-10-30T15:14:53.245+00:00""1""public""f5ea4524fc7744d99776406c9c708cd2""0"3"0""2026-10-30T15:14:53.245+00:00""RIPD E4000-26-3-25 Deep Pit Furnace.pdf"235654"file"".pdf""1""2026-10-27T20:12:20.077+00:00""25c138731192409d9c150c1b3191c041""public""0""public""2dbd4162d05a466b88eddf0d2d48ff12""0"2"0""26-3-25 CDRL.pdf"329682"file"".pdf""1""2026-10-27T20:12:20.077+00:00""a038472c43814181b19569d2eaa90de8""public""0""public""767c75652a1949088296e456ec2c8291""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0fb2e3728bf842419ea9490a8f7f03a9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.