- VERMONT CA-96
Contract Number: C03302
Contract Name: KILLINGTON-STOCKBRIDGE ER STP 022-1(25)
VERMONT
AGENCY OF TRANSPORTATION
PROPOSAL
STANDARD SPECIFICATIONS FOR CONSTRUCTION
DATED 2024 SHALL APPLY TO THIS CONTRACT
SPECIAL PROVISIONS
SCHEDULE OF ITEMS
ELECTRONIC BID BOND to be submitted in the amount of 5% of the Contractor's bid.
BIDDING PROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregular if they are not in compliance with Agency specifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
System services.
VTrans Mission and Vision
Through excellent customer service, provide for the safe and efficient movement of people and goods.
A safe, reliable, and multimodal transportation system that grows the economy, is affordable to use and
operate, and serves vulnerable populations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
240-0001 TEMPORARY ROADWAY ______________________________________________ 15
301-0001 RECYCLED ASPHALT PAVEMENT BASE _________________________________18
675-0002 REMOVE AND RESET PRIVATE SIGN ASSEMBLY _________________________20
State Wetland Permit ____________________________________________________________ 23
404 Corps of Engineers Permit ____________________________________________________ 36
ANR RME Consultation _________________________________________________________ 87
Flood Hazard Area and River Corridor Permit ________________________________________ 88
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 92
USDOL Davis Bacon Wage Rates 2026 - Rutland County _______________________________ 104
USDOL Davis Bacon Wage Rates 2026 - Windsor County ______________________________ 108
Bidding Requirements and Conditions ______________________________________________ 112
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 124
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 129
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 139
Standard Federal EEO Construction Contract Specifications _____________________________ 142
Contractor EEO Certification Form - CA109 _________________________________________ 149
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 150
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 154
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 155
Proposal Schedule of Pay Items ____________________________________________________ 156
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
PIN Number(s): 12B234 Page 1
Special Provisions Part I – Notices to Bidders
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS – CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 13, 2028.
2. NOTICE TO BIDDERS – INTERIM COMPLETION DATE. The Contractor is hereby notified
that they shall complete all the following work on or before November 15, 2027:
(a) All work associated with the precast box culvert replacements at Station A 16+75.69 (Mile
Marker 0.317) in the Town of Pittsfield and Station A 168+69.44 (Mile Marker 3.195) in
the Town of Pittsfield.
(b) All underdrain, all headwalls, and all work associated with catch basins, culvert extensions,
and cross culverts within the project limits, with the exception of the following:
(1) Catch basins and drainage features between Station A 130+00 (Mile Marker 2.462)
and Station A 134+25 (Mile Marker 2.543) in the Town of Pittsfield.
(2) Underdrain locations which are in direct conflict with the highway shoulder, as
specified on the Plans. See the column titled “Conflict with Shoulder
Reconstruction” on the Underdrain Detail Sheets in the Plans for a list of these
locations.
If this interim completion date is not met, liquidated damages in the amount of 30% of the
applicable rate specified in Table 108.12A will be assessed in accordance with Subsection
108.12(b).
3. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 2
4. NOTICE TO BIDDERS – WORK REQUIREMENTS. The Contractor is hereby notified that no
work associated with final paving shall occur in 2027. The term final paving includes, but is not
limited to, coarse-milling beyond the limits necessary to place temporary cover pavement at the
approach to the box culverts, cold in-place recycling, final grading, roadway shoulder
reconstruction, roadway shoulder preparation, roadway shoulder widening, installation of leveling
course pavement, and installation of final wearing course pavement.
Estimated quantities of removing and resetting guardrail and temporary cover pavement have been
included in the Contract for use in 2027 where areas of the existing roadway are either damaged
or removed as a result of work required in Notice to Bidders No. 2.
5. NOTICE TO BIDDERS – WORK OUTSIDE OF THE CONSTRUCTION SEASON. The
Contractor is hereby notified that limited work outside of the construction season, as defined in
Subsection 101.02, will be permitted on this Contract. Only activities necessary to clear trees, as
determined by the Engineer, will be allowed to be performed outside the construction season. The
Contractor shall notify the Engineer at least 14 calendar days before work outside the construction
season is to begin.
Allowance of work outside of the construction season does not relax or waive any applicable
specification requirements, including requirements and limitations related to workmanship,
weather, temperature, materials, or any other conditions for any item of work.
6. NOTICE TO BIDDERS – WORK ZONE TRAFFIC (MM 0.317 TO MM 3.195 IN PITTSFIELD).
The Contractor is hereby notified that, if the two box culverts at MM 0.317 and MM 3.195 in
Pittsfield are concurrently under active construction and are both reduced to one-lane traffic for
more than 24 hours at the same time, no other lane closures will be allowed between these two
locations.
The Contractor must seek written permission from the Engineer to perform any work outside the
parameters defined in this provision.
7. NOTICE TO BIDDERS – ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 3
https://vtrans.vermont.gov/sites/aot/files/documents/VTrans%20Guidance%20for%20Contractor
s%20and%20Suppliers.pdf
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
8. NOTICE TO BIDDERS – ELECTRONIC TICKETING VTRANS PORTAL. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the VTrans
Portal and use the application for distribution and management of electronic tickets (e-tickets).
VTrans Portal is a state cloud-based e-ticket database, including a web-based user interface and a
jobsite mobile e-ticket application. VTrans Portal will interface with the Contractor’s supplier
existing point of sales or e-ticketing platform and will allow VTrans to manage bituminous
material e-tickets.
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
9. NOTICE TO BIDDERS – CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on
November 18, 2026. Inquiries received prior to this time will receive a response from the Agency.
Inquiries received after this time may receive a response at the Agency’s discretion.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 4
10. NOTICE TO BIDDERS – OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
Vermont Wetland General Permit
US Army Corps of Engineers 404 Permit
ANR Title-19 Permit
Flood Hazard Area & River Corridor General Permit
FHWA 1273 – Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements – CR-110
Attachment C – Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances - Appendices A and E
Standard Federal Equal Employment Opportunity Construction Contract Specifications – CA26
Contractor Equal Employment Opportunity Certification Form – CA109
Vermont Agency of Transportation Certificate of Compliance – CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates – CA101
Commodity Index Prices – CA170
Schedule of Pay Items
11. NOTICE TO BIDDERS – BIDDERS LIST FORM. The Contractor is hereby notified that the
Agency is required by the U.S. Department of Transportation to develop and maintain a list of
information about all firms that bid on federally funded Contracts in accordance with 49 C.F.R. §
26.11. The Agency has developed a new electronic form to collect this information. The Contractor
shall fill out this form as part of their project-specific prequalification for every Contract that they
bid on. A link to this form is provided in the prequalification form available through iCX and the
Agency’s website.
12. NOTICE TO BIDDERS – DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
13. NOTICE TO BIDDERS – GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
14. NOTICE TO BIDDERS – STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/user_files/cadd_help/WebFiles/Downloads/Standards/VAO
TconSTD_Owner.xml?_gl=1*1bgjbkk*_ga*MTE4ODI3MzMyMy4xNzcwOTA3Mzk4*_ga_V9
WQH77KLW*czE3OTAyMDEzNjYkbzEyOCRnMCR0MTc5MDIwMTM3MyRqNTMkbDAk
aDA.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 5
15. NOTICE TO BIDDERS – INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
16. NOTICE TO BIDDERS – SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. § 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
17. NOTICE TO BIDDERS – ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species.
(1) The Contractor shall ensure all personnel working on the project site are made
aware of the potential presence and protected status of the northern long-eared bat
and tricolored bat. The Contractor shall ensure all personnel working on the project
site are aware of all environmental commitments related to the northern long-eared
bat.
All trees shall be clearly demarcated prior to removal. The removal of trees shall
be completed between OCT 1- APR14, inclusive.
The Contractor is hereby made aware of the potential for TOY restrictions related
to proposed off-site activities. Cutting trees ≥ 3" DBH inches in diameter outside
of the contract project limits shall require review under Section 105.25 Opening
Off-Site Activity Areas.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 6
(b) Contaminated/ Urban Soils Background Area.
(1) A portion of this project is located within an Urban Soils Background Area, as
shown on the Vermont ANR Natural Resources Atlas. These areas may have high
background levels of certain constituents, therefore the Agency has determined that
material generated from these areas should be disposed within an Urban Soil
Background Area. These soils shall be reused on-site to the maximum extent
possible within the urban soils background area portion of the project. Excess
Urban Area soils shall be disposed off-site by the Contractor within a designated
Urban Soils Background Area. The process for submittal and review of proposed
disposal locations shall be in accordance with Standard Specifications Section
105.25-105.27.
If the Contractor elects to use an alternate location outside of an Urban Soil
Background Area, then soils must be disposed in accordance with the Investigation
and Remediation of Contaminated Properties Rule (IRule) at no additional expense
to the project. The alternate location must be reviewed and approved by VTrans,
and the Contractor must secure all necessary permits and approvals from the
Vermont Agency of Natural Resources for the alternate disposal site.
18. NOTICE TO BIDDERS – UTILITIES. Existing aerial facilities owned by Green Mountain Power,
Consolidated Communications, GWI Vermont, and Vermont Telephone Company will be
adjusted, as necessary, by employees or agents of the above companies in accordance with the
"Approximate Aerial Utility Relocation Route" shown on the project plans. The Contractor is
cautioned to protect these facilities from damage.
Various locations in the plans will require coordination with Green Mountain Power to hold the
poles while excavation takes place near the poles.
Station A25+47 RT will require the contractor to coordinate with GMP to install a new pole once
the earthwork is completed in this area. The Contractor is to give the affected utility companies at
least 2 weeks’ notice prior to excavation in this area, and then will need to coordinate the removal
of the existing pole with the utility companies.
Existing active underground facilities owned by Consolidated Communications will remain active
from station 49+25 RT to 94+20 RT and from station B30+65 RT to B69+43 LT. Duct bank
locations on the plans are approximate based on field investigations. Portions of the duct bank
have been abandoned and may be encountered during excavation in the highway right-of-way. The
contractor shall verify duct bank is abandoned before removal.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 7
Contacts for the above listed companies are as follows:
Green Mountain Power (Killington) Shelby Carleton (802) 770-3440
Green Mountain Power (Stockbridge – Pittsfield) Caleb Hawley (802) 234-5120
Consolidated Communication Tucker Peterson (802) 735-7550
GWI Vermont Josh Bohar (207) 298-4940
Vermont Telephone Company Judy Paton (802) 289-2104
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
“204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I).”
Contractor shall notify aerial utility pole owner if excavation will be within 10 feet of an existing
pole. That pole owner may choose to be onsite for this activity. There will be no excavation
allowed within 5 feet of existing poles and anchoring.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
Vermont Statutes Annotated, Title 30, Chapter 86 (“Dig Safe”) requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency’s Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency’s underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor’s
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in the Standard Specifications for Construction in
Subsection 107.12 Protection and Restoration of Utilities and Services.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 8
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor’s Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
19. NOTICE TO BIDDERS – CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 – CONCURRENT CONSTRUCTION PROJECTS
Project Contractor Anticipated Contract
Completion Date
Killington RAIZ(7) TBD Fall 2028
Rochester-Warren STPG SIGN(78) TBD Fall 2028
Killington STP CULV(120) TBD TBD
Stockbridge BO 1444(61) C/1 TBD TBD
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or
private construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
20. NOTICE TO BIDDERS – SALVAGED MATERIALS. The Contractor is hereby notified that up
to 500 tons of Item 210.1000 Coarse-Milling, Bituminous Pavement removed and not re-used on
the project shall remain the property of the State.
All costs for loading and delivering these salvaged materials will be incidental to Contract Item
210.1000 Coarse-Milling, Bituminous Pavement.
The Contractor shall load the salvaged material onto suitable transport and deliver it to the VTrans
Royalton district garage at 1953 Vermont Route 107, Royalton, Vermont 05068.
The Contractor shall contact Shauna Clifford District Transportation Administrator Tel.: (802)
295-8888 a minimum of 2 weeks prior to beginning delivery to the designated location.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 9
21. NOTICE TO BIDDERS – SPECIAL CONSTRUCTION REQUIREMENTS.
(a) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 11 feet. This paved width shall remain free of
obstructions and obstacles at all times.
(b) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs will be paid for under Contract item 641.1500 or 641.1700, as applicable.
The Contractor shall also install and maintain appropriate construction signing warning the
traveling public of the expected roadway surface conditions.
(c) Prior to final acceptance of the project, all drop inlets and bridge joints within the project
limits shall be cleaned and all material within the drop inlets and bridge joints shall be
removed. All paved areas adjacent to curbs shall be swept and cleaned of all extraneous
material. Costs for this work will not be paid for directly, but will be considered incidental
to all Contract items.
(d) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor’s part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
For more information about area special events, contact the following:
Stockbridge: Jill Gifford
Town Clerk
1722 VT Route 100
Stockbridge, Vermont 05772
(802)746-8400
Email: townclerk@stockbridgevt.gov
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 10
Pittsfield: Tricia Abbondelo
Town Clerk
40 Village Green
P.O. Box 556
Pittsfield, Vermont 05672
(802) 746-8170
Email: townclerk@pittsfieldvt.com
Killington: Robert Kovalesky
Interim Town Manager
2046 US Route 4
Killington, Vermont 05751
(802) 422-3241
Email: manager@killingtontown.com
TABLE 1 – SCHEDULE OF KNOWN EVENTS
Event Date
Pittsfield Memorial Day Parade May 2027/2028
Pittsfield Ridgefest June 2027/2028
Vermont 100 Endurance Race July 2027/2028
Killington Spartan Race September 2027/2028
Pittsfield Halloween on the Village Green October 2027/2028
22. NOTICE TO BIDDERS – AFAD. The Contractor is hereby notified that Automated Flagger
Assistance Devices (AFADs) are remotely operated devices that enable a certified flagger to be
positioned out of the lane of traffic and are used to control motorists through work zones.
AFADs shall only be used in situations where there is no more than one lane of approaching traffic
that needs to be controlled. Additionally, since AFADs are not traffic control signals, they shall
not be used to replace traffic signals or other continuously operating traffic control devices.
These devices may be used as a safety enhancement to flaggers on an hour-for-hour basis. AFADs
shall meet the following requirements:
(a) All AFAD applications shall meet the requirements of the applicable sections of the current
edition of the Manual on Uniform Traffic Control Devices (MUTCD).
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 11
(b) All AFAD applications shall be in accordance with NCHRP Report 350 or the MASH for
the applicable test level and device weight. Documentation of the crashworthiness of the
device shall be submitted to the Engineer for approval prior to use on the project.
(c) AFAD applications shall always be controlled by a flagger who has been trained in the
operation of the AFAD and who meets the requirements of Section 630. The flagger shall
not flag traffic and operate an AFAD at the same time.
(d) Should an AFAD malfunction or otherwise not function as intended they shall be replaced
by another AFAD or flagger(s) or work shall cease and the roadway shall be opened to
unrestricted traffic flow immediately.
(e) Each AFAD will be considered equivalent to one flagger and will be measured and paid
for on an hourly basis under Item 630.1500 Flaggers. One hour of AFAD use shall be paid
for as one hour of flagging.
(f) Flaggers will only be measured for payment when actually performing flagging duties.
Flaggers controlling AFADs but not actually flagging will not be measured for payment,
but will be considered incidental to the Contract lump sum price for Item 641.1000 Traffic
Control, or Item 641.1100 Traffic Control, All-Inclusive, as applicable.
(g) The use of AFADs may be suspended at the discretion of the Engineer.
23. NOTICE TO BIDDERS – FUEL PRICE ADJUSTMENT. In addition to the items specified in
Section 690, the Special Specification items listed in Table 1 will also be eligible for Fuel Price
Adjustment under Section 690.
TABLE 1 – SPECIAL SPECIFICATION ITEMS SUBJECT TO FUEL PRICE ADJUSTMENT
Special Specification Pay Items Subject to Adjustment: Using the Tabulated Fuel Usage
Factor and Threshold Quantity for:
Item No. Item Name Work Category
N/A N/A N/A
24. NOTICE TO BIDDERS – ALTERNATE ITEMS. A complete bid proposal for this Contract must
include two total bid prices, one for each subtotal of an Alternate plus the subtotal of Items
Common to All Alternates as indicated in the Schedule of Items.
The apparent low bidder will be the responsible bidder submitting the lowest total bid for either
alternate.
Award of the Contract, if it be awarded, will be made to the lowest responsible bidder under the
alternate for which the lowest total bid is submitted.
Killington-Stockbridge ER STP 022-1(25) Advertised November 4, 2026
Special Provisions Part I – Notices to Bidders Page 12
25. NOTICE TO BIDDERS – COARSE-MILLING. Subsection 210.03(b) is hereby modified by
deleting all instances of the phrase “14 calendar days” and “14 calendar day” and replacing them
with the phrase “28 calendar days” and “28 calendar day”, respectively.
In areas where cold in-place recycling is specified to be performed, the Contractor is not required
to cover the milled surface after 28 days, however, the cold in-place recycling shall be completed
within 28 days of milling the road surface.
26. NOTICE TO BIDDERS – SUBSECTION 101.02. Subsection 101.02 is hereby modified by
revising the definition of “Contract” to add the phrase “General Special Provisions” immediately
following the phrase “Standard Specifications”.
27. NOTICE TO BIDDERS – SUBSECTION 728.02. When material is supplied in accordance with
Subsection 728.02(b) or Subsection 728.02(e), material in accordance with AASHTO M 180-18 or
AASHTO M 180-23 may be substituted in place of material meeting AASHTO M 180-25.
Special Provisions Part II – Special Specifications
SECTION 240-0001 – TEMPORARY ROADWAY
240-0001.01 DESCRIPTION. This work shall consist of the construction, maintenance, and removal of
temporary pavement, temporary roadway widening, temporary traffic diversions, and highway crossovers,
collectively termed temporary roadways, used to maintain traffic within the project limits as shown on the
Plans and as directed by the Engineer.
240-0001.02 MATERIALS. The Contractor may use any material or combination of materials that will
conform to the requirements of this section and the Plans and meet the approval of the Engineer. The
Engineer shall have the right to reject materials that will not meet structural requirements.
240-0001.03 SUBMITTALS. Construction drawings shall be submitted in accordance with Subsection
105.06 for any support of excavation, retaining structures, or bracing required or proposed for completing
the work under this section.
If the temporary roadway is not fully designed in the Plans, the Contractor shall also submit, in accordance
with Subsection 105.06, a plan showing the layout, alignment, typical sections, materials, and any other
details and information necessary to construct the temporary roadway.
240-0001.04 CONSTRUCTION REQUIREMENTS. Where temporary roadways are not being
constructed on in-situ materials, embankments shall be constructed of acceptable fill material that has
been compacted to adequately support the loading requirements of the highway traffic is being diverted
from. The subbase shall extend for the full length of the temporary roadway. Topsoil removed for
temporary roadway construction may be stockpiled and reused in accordance with Section 651 for all
phases of temporary roadway construction, or removed at the discretion of the Engineer.
The Contractor shall extend any existing drainage structures or place new temporary drainage structures
to the extent necessary to accommodate the temporary roadway and any widening needed, using a box
culvert, pipe, or other means as shown on the Plans and as directed by the Engineer. Where a temporary
bridge is required, all requirements of Section 528 shall be met.
Unless the Plans prescribe other pavement design criteria specifically for temporary roadways, bituminous
concrete mixtures shall conform to the requirements of Section 716 and shall have an Ndesign value of 65
gyrations and use an asphalt binder grade of 58S-28. Bituminous concrete pavement shall conform to the
requirements of Section 406, except that Agency materials evaluation will not be required. The temporary
pavement shall extend for the full length of the temporary roadway. Temporary pavement markings shall
be placed in accordance with Section 646. The temporary pavement markings shall extend for the full
length of the temporary roadway or as necessary to match into existing pavement markings. The Engineer
may waive weather limitations for placement of bituminous concrete pavement and temporary pavement
markings.
Special Provisions Part II – Special Specifications
When temporary traffic barriers are used, they shall be in accordance with Section 621.
If the Plans require the temporary roadway earthwork to remain in place at the completion of the project,
the pavement shall be removed from the temporary roadway and turf shall be established as shown on the
Plans and in accordance with Section 203, Section 651, and Section 653.
(a) Temporary Cover Pavement. Unless otherwise specified on the Plans, temporary cover pavement
shall consist of a single 2 inch lift of Type IIIS or Type IVS bituminous concrete pavement.
(b) Temporary Roadway Widening. Unless otherwise specified on the Plans, a minimum of 6 inches
of approved gravel or other acceptable subbase material shall be provided for the full width of the
typical section, and the roadway surface shall be paved with two lifts of bituminous concrete
pavement to a minimum depth of 3 inches, with a wearing course of Type IIIS or Type IVS
bituminous concrete pavement.
(c) Temporary Traffic Diversion. Unless otherwise specified on the Plans, a minimum of 12 inches of
approved gravel or other acceptable subbase material shall be provided for the full width of the
typical section, and the roadway surface shall be paved with two lifts of bituminous concrete
pavement to a minimum depth of 3 inches, with a wearing course of Type IIIS or Type IVS
bituminous concrete pavement.
(d) Divided Highway Crossover. Unless otherwise specified on the Plans, a minimum of 18 inches of
approved gravel or other acceptable subbase material shall be provided for the full width of the
typical section, and the roadway surface shall be paved with two lifts of bituminous concrete
pavement to a minimum depth of 4 inches, with a wearing course of Type IIIS or Type IVS
bituminous concrete pavement.
240-0001.05 METHOD OF MEASUREMENT. The quantity of Temporary Cover Pavement to be
measured for payment will be the number of tons of mixture complete in-place in the accepted work as
determined from the weight tickets.
The quantity of Temporary Roadway Widening, Temporary Traffic Diversion, and Divided Highway
Crossover to be measured for payment will be on a lump sum basis for each temporary roadway specified
on the Plans.
240-0001.06 BASIS OF PAYMENT. The accepted quantity of Temporary Cover Pavement will be paid
for at the Contract unit price per ton. The accepted quantity of Temporary Roadway Widening, Temporary
Traffic Diversion, and Divided Highway Crossover will be paid for at the Contract lump sum price.
Special Provisions Part II – Special Specifications
Payment will be full compensation for constructing, maintaining, and removing the temporary roadway,
including any required excavation, milling, stockpiling topsoil, fill materials, and subbase materials;
temporary culverts, pipes, and bridges; temporary retaining structures or bracing and submitting any
required construction drawings; drilling and blasting of solid rock subgrade; saw cutting pavement,
emulsified asphalt, bituminous concrete pavement, pavement marking mask, and temporary pavement
markings; re-handling and spreading topsoil, topsoil, fertilizer, agricultural limestone, hay mulch, and
seeding; adjusting the height of existing guardrail, re-lapping existing guardrail, temporary guardrail,
temporary traffic barrier, removing and resetting delineators and posts, and removing and resetting signs;
removing those portions of the temporary roadway not being incorporated in the permanent work or as
directed by the Engineer; and for furnishing all labor, materials, tools, equipment, and incidentals
necessary to complete the work.
Temporary traffic control devices and construction signing will be paid for separately under the
appropriate Section 641 Contract items.
Partial payments for Temporary Roadway Widening, Temporary Traffic Diversion, and Divided Highway
Crossover will be made as follows:
(a) An initial payment of 75% of the Contract lump sum price will be paid when the temporary
roadway is completed and accepted by the Engineer. The Engineer may prorate this amount for
the duration of the work.
(b) The remaining 25% of the Contract lump sum price will be paid when the designated portions of
the temporary roadway have been removed to the satisfaction of the Engineer.
When multiple sections or phases of temporary roadway are required on the Contract, at the Engineer’s
discretion, payment will be prorated proportional to the amount of the work covered by each section or
phase.
Payment will be made under:
Pay Item Pay Unit
240.0100001 Temporary Cover Pavement ...............................................................Ton
240.0100002 Temporary Roadway Widening ..........................................................Lump Sum
240.0100003 Temporary Traffic Diversion ..............................................................Lump Sum
240.0100004 Divided Highway Crossover ...............................................................Lump Sum
Special Provisions Part II – Special Specifications
SECTION 301-0001 – RECYCLED ASPHALT PAVEMENT BASE
301-0001.01 DESCRIPTION. This work shall consist of furnishing and placing one or more courses of
recycled asphalt pavement (RAP) material on a prepared surface or at other locations as directed by the
Engineer.
301-0001.02 MATERIALS. Materials shall meet the requirements of the following subsections:
Aggregate Shoulders, RAP ............................................................................. 704.12(d)
301-0001.03 CONSTRUCTION REQUIREMENTS. RAP base shall be constructed in accordance with
the requirements of Subsection 301.03 and Subsection 301.05.
301-0001.04 COMPACTION. The Contractor shall compact each layer until a density of not less than
95% of the target maximum density (TMD) has been achieved, or to the satisfaction of the Engineer.
The TMD shall be determined by the Contractor via AASHTO T 355 or AASHTO T 343 with a density
build-up, by compacting until the density readings show less than 1 pcf change for the final roller
passes. The Contractor shall notify the Engineer 48 hours prior to performing the build-up to allow for
observation and verification by Agency personnel. The Engineer will require a new TMD to be established
if there is a change in equipment or practices, if the TMD is being achieved with minimal compactive
effort, or if the TMD value lacks substantiating evidence.
Upon request by the Engineer, the Contractor shall provide all compaction records in a format acceptable
to the Engineer at the conclusion of each day’s operations.
301-0001.05 METHOD OF MEASUREMENT. The quantity of Base of RAP to be measured for payment
will be the number of tons of material placed in the complete and accepted work as determined from the
load tickets.
301-0001.06 BASIS OF PAYMENT. The accepted quantity Base of RAP will be paid for at the Contract
unit price per ton. Payment will be full compensation for furnishing, blending, transporting, testing,
placing, grading, and compacting the material specified and for furnishing all labor, mater