Project requirement is to replace the existing 15-ton heat pump system, hot water coil auxiliary heat, and all associated ductwork serving the Network Enterprise Command (NEC) administrative Building #179 with a new 10-ton heat pump/propane furnace system and all new ductwork.
Replace the existing 15-ton heat pump system, hot water coil auxiliary heat, and all associated ductwork serving the Network Enterprise Command (NEC) administrative Building #179 with a new 10-ton heat pump/propane furnace system and all new ductwork.
We post new hvac opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/CE809D01-36CF-448F-8830-BBEEF2DDC255"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/CE809D01-36CF-448F-8830-BBEEF2DDC255\"\">IFB IGSA 26-05 FINAL.docx</a>"]["CE809D01-36CF-448F-8830-BBEEF2DDC255"]["IFB IGSA 26-05 FINAL.docx"]["12676098"]["11/13/26"]["IFB IGSA #26-05 Building 179 NEC HVAC Replacement"]["RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.