Rosebud Agency HVAC Upgrade
The contractor shall perform limited demolition and removal of the existing boiler system and mechanical, electrical, and plumbing (MEP) components. Work includes asbestos abatement of ceiling tile and associated adhesive in ground/first-floor hallways, removal of insulation from crawlspace piping and boiler-room equipment, and removal of any other thermal-system insulation containing asbestos. The contractor shall install new variable refrigerant flow (VRF) equipment for cooling and heating in multiple zones, dedicated outdoor air systems (DOAS) with ductwork terminating at sidewall grilles, electric baseboard heaters, electric water heaters, new ductwork and air distribution, controls, and associated mechanical and electrical work. All work must maintain the existing roof warranty during and after HVAC penetrations and patching. The contractor must provide third-party industrial hygiene services for air monitoring during asbestos removal, baseline sampling, daily work-area monitoring, and final clearance sampling. Owner will continue occupying adjacent building portions during construction; contractor must coordinate phasing and schedule to minimize disruption.
We post new hvac opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20192""RESTON""VA""USA""12220 SUNRISE VALLEY DRIVE""Mail Stop-244""Sol_140A1627Q0113_Amd_0001.pdf"206297"file"".pdf""1""2026-11-20T17:04:58.39+00:00""7310c7a3c6f44bdbae9360ec89653be5""public""0""public""d51151e776954ec8b1f33ba7c633e53b""0"11"0""Sol_140A1627Q0113.pdf"464052"file"".pdf""1""2026-11-20T14:35:53.885+00:00""0d5b4af4ad214a41a0cdbb53a677775b""public""0""public""a56f15caa28e43f9bd1ee7d78740b81d""0"10"0""Attachment_9_-_Pricing_Schedule.pdf"55259"file"".pdf""1""2026-11-20T14:35:53.885+00:00""132f6074428d433a92e88d0992f9f06b""public""0""public""0ab05df63adf43acafab64a437cef03c""0"9"0""Attachment_1_-_Drawings.pdf"17150248"file"".pdf""1""2026-11-20T14:35:53.885+00:00""f1b99c46a59741dd8a838676095326c3""public""0""public""d5c4dce807b54e5ebd23148a25ecfe4f""0"8"0""Attachment_2_-_Specifications.pdf"8177721"file"".pdf""1""2026-11-20T14:35:53.885+00:00""0f577145e7b34101aec958b2107fee2c""public""0""public""9f5e4d41fbe14244857124876ebb27ee""0"7"0""Attachment_3_-_IEE_Representation_Form.pdf"29473"file"".pdf""1""2026-11-20T14:35:53.885+00:00""c542ff9f54ae499cac81f7080f69d9ac""public""0""public""0d7e9605a4ee4c30a16aaf78604a064c""0"6"0""Attachment_4_-_SD20260018_051826.pdf"154976"file"".pdf""1""2026-11-20T14:35:53.885+00:00""2e515ca394284a3aba21bdafe7ce5d96""public""0""public""070daa42f17e4b84881a21f67c648809""0"5"0""Attachment_5_-_1069638WAR.pdf"683888"file"".pdf""1""2026-11-20T14:35:53.885+00:00""8f4625a7329e4127a5535cdba39aadfd""public""0""public""26c366cb9aeb47d591ab9d62b28cef31""0"4"0""Attachment_6_-_BLD_1004_HAZARDOUS_MATERIAL_SURVEY.pdf"13982047"file"".pdf""1""2026-11-20T14:35:53.885+00:00""8e9a2dead46447c2922e1acc8737aabf""public""0""public""995d38580bc3493ab338823ca4c3abe9""0"3"0""Attachment_7_-_Pre-Bid_RFIs_Responses.docx"74767"file"".docx""1""2026-11-20T14:35:53.885+00:00""09346723c02c405aa945166ef6c46d93""public""0""public""be4006a0b43b4b899c70e9062fecae56""0"2"0""Attachment_8_-_ASI_001.pdf"1296326"file"".pdf""1""2026-11-20T14:35:53.885+00:00""e79cd8e6416e44cc8f85ed60a7861794""public""0""public""e76fb1c6bd7b4363a1e100f251acc5cd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 91eeac52727a452897adfa3357c68817), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.