To modify the existing far side movable grating HPU starter box, install a new PLC control cabinet on Pier 1N and control cabinet on thefar side span lock platform, remove all of the existing fully seated movable grating limit switches, install new movable gratingfully seated limit switches at, install new fully raised movable grating limit switches and rotary cam limit switch at the far sidespan lock platform and integrate all of the new equipment into the existing PLC and control system.
The contractor must modify the existing far side movable grating HPU starter box, install a new PLC control cabinet on Pier 1N and a control cabinet on the far side span lock platform, remove all existing fully seated movable grating limit switches, install new movable grating fully seated limit switches, install new fully raised movable grating limit switches and a rotary cam limit switch at the far side span lock platform, and integrate all new equipment into the existing PLC and control system.
We post new appliances opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/C3988D78-04B7-4FF0-90E3-7EBBACBE2C0B"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/C3988D78-04B7-4FF0-90E3-7EBBACBE2C0B\"\">Coleman Bridge HPU Integration.pdf</a>"]["C3988D78-04B7-4FF0-90E3-7EBBACBE2C0B"]["Coleman Bridge HPU Integration.pdf"]["6018482"]["10/30/26"]["Coleman Bridge HPU Integration"]["RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.