Salt Lake County, on behalf of its Division of Flood Control, “County” is solicitating bids from qualified firms “Bidder / Contractor” to provide services for the loading, hauling and disposal of bulk materials resulting from the dredging of Lee Drain including (but not limited to) dredged sediment, riprap, sand, woody debris, and miscellaneous refuse. The County’s best estimate of the material quantity is approximately 13,850 tons. The County has divided the length of Lee Drain into seven zones; the County reserves the right to award only a portion of these zones based on available funding. Zone 1 will form the base bid. Zones 2, 3, 4, 5, 6, and 7 are assigned to Alternatives A, B, C, D, E, and F, respectively.
The County is considering two options, which are described below. The County may award either Option I or Option II based on total cost and operational considerations. The County reserves the right to reject the option with the lowest stated total cost for option 1 if option two is determined to be operationally in the County’s best interest.
Option I: The loading of material shall be performed by County Flood Control Operations Crew using County equipment. In this case, County Staff will be on site operating a loader and/or excavator from 7:30 am to Contractor’s end of day.
Option II: The loading of material shall be performed entirely by the Contractor. The Contractor shall provide all supervision, labor, tools, fuel, and equipment (such as loaders and/or excavators) necessary to load the material. Loading equipment shall be appropriate for the site conditions and material and shall be operated by qualified personnel.
Under either loading option, bidders are to provide trucks and drivers for hauling and disposal of dredged material located in each mapped segment. Material may be disposed of in any legal manner or location determined by the contractor. Contractor is responsible for maintaining appropriate tracking controls and BMPs for the duration of the project including cleaning and maintaining access roads and public streets as well as giving a 2-day notice prior to project start to Trever Swensen (801)-971-2146. Weekend and holiday work is prohibited. Bidders are reminded not to contact County personnel and are to direct all questions/comments to the Public Q&A within the Bonfire portal during the term of the solicitation period.
Contractor is to legally dispose of hauled material at a designated landfill or other location of their choosing at which they have the legal authorization to dispose of the material. Weigh tickets will be required to determine actual quantities transported. The Contractor assumes all liability and holds Salt Lake County harmless if material is disposed of illegally. Material has been tested by the County and can be assumed to be acceptable for disposal at the Salt Lake County Landfill.
Contractor must meet the following requirements:
The Contract will be awarded to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and prioritized alternates up to the budget amount, provided the bid is reasonable and in the best interests of the County to accept. Alternates will be accepted on a prioritized basis with Alternate 1 being highest priority, Alternate 2 having second priority, etc. The County may designate alternates as additions to or deductions from the base bid.
The contractor must provide trucks and drivers to haul and legally dispose of dredged material from Lee Drain, either with County-provided loading (Option I) or contractor-provided loading (Option II). The contractor is responsible for tracking controls, best management practices, cleaning access roads and public streets, and giving a 2-day notice prior to project start. Weekend and holiday work is prohibited. Disposal must be at a location the contractor has legal authorization to use; weigh tickets are required to verify quantities. The contractor assumes all liability for illegal disposal.
We post new transportation & logistics opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: State of Utah (Bonfire) (solicitation 260280), retrieved via the Utah Bonfire procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.