29 October 2026 Update: RFP Amendment 0001 posted with updated attachments. The only attachments with changes are:
Attachment 1 - TEP Worksheet
Attachment 2 - TRD
Attachment 3 - Section L
Attachment 4 - Section M
All other attachments remain as posted in original RFP.
Response date of 1 March 2027 is unchanged. Please sign and return Amendment along with proposal.
RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2)
Overview
Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures.
**Solicitation Number: **SPRHA1-26-R-1003
**Set-Aside Status: **100% Small Business Set-Aside
**NAICS Code: **336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
**PSC Code: **1620 - Aircraft Landing Gear Components
**Contract Type: **Single-Award ID/IQ (Firm-Fixed-Price with EPA)
**Period of Performance: **10 Years (5-Year Base + One 5-Year Option)
Scope of Work
The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times.
The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include:
Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts.
Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%.
Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management.
Solicitation Attachments & Instructions
The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting.
Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you.
Points of Contact:
Primary: Nathan Flinders, Contracting Officer (nathan.flinders@dla.mil)
Secondary: Justin Rogers, Contracting Officer (justin.rogers.28@us.af.mil)
The contractor will provide end-to-end supply chain management for approximately 2,800 NIINs of USAF Depot Level Reparables and DLA consumable landing gear parts, including engineering oversight, quality assurance, procurement, strategic raw material purchasing, forging die management, and obsolescence/DMSMS management. The contractor must achieve 95% OTD for DLA-managed parts and 90% OTD for USAF-managed parts, reduce production lead times by at least 25%, and manage subcontractors, forgings, and technical data packages throughout a 10-year period of performance (5-year base plus a 5-year option).
We post new vehicles & fleet opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"84056-5820""HILL AIR FORCE BASE""UT""USA""DLR PROCUREMENT OPERATIONS (AU)""6051 GUM LANE BLDG 1225""SPRHA126R1003_______0001.pdf"18841"file"".pdf""1""2026-10-29T19:33:01.653+00:00""6687e81e26764bf283a355a23c2ba206""public""0""public""167bebb1dd6540f69448b9f4539abae0""0"75"0""SPRHA126R1003.pdf"169427"file"".pdf""1""2026-08-19T20:55:37.183+00:00""92ef45c20d3640bba94432a25667973e""public""0""public""0a131e4241f5469d88cf21eeaf079802""0"74"0""AMENDED Attachment 1 - TEP Worksheet 102926.xlsx"1493203"file"".xlsx""1""2026-10-29T19:33:01.653+00:00""f6aa3e9c42f7472b8699963c56703452""public""0""public""e54cc2575dea4aa282f0ba14cc66ad6c""0"73"0""AMENDED Attachment 2 - TRD 102926.pdf"364530"file"".pdf""1""2026-10-29T19:33:01.653+00:00""7b190bc4ea2c4561af3229ca0f94ce5f""public""0""public""c8fa7c80b6384c4a9558c6e1c17921ff""0"70"0""AMENDED Attachment 3 - Section L 102926.pdf"231166"file"".pdf""1""2026-10-29T19:33:01.653+00:00""ac4b9350a9504ab8bd24d97e78ac1dad""public""0""public""eb34405c613648c09cfcb77f5ba0703e""0"69"0""AMENDED Attachment 4 - Section M 102926.pdf"171221"file"".pdf""1""2026-10-29T19:33:01.653+00:00""93f1395524004d3fb59120a24ea900da""public""0""public""6b2400544a3149abb6a0e00b9d6aec08""0"65"0""Attachment1TEPWorksheet.xlsx"1435190"file"".xlsx""1""2026-08-19T20:55:37.183+00:00""3b02fdd026524c51ab3377e98c695b71""private""2026-10-29T19:33:01.653+00:00""1""controlled""5f92f174292046f494b65a663ed59e7c""1"55"0""2026-10-29T19:33:01.653+00:00""Attachment2TRD.pdf"378383"file"".pdf""1""2026-08-19T20:55:37.183+00:00""322e9553dddf4c859d0df777a8ad54d6""public""2026-10-29T19:33:01.653+00:00""1""public""c523e23f4ac647ecb4537d7f3dea3eff""0"54"0""2026-10-29T19:33:01.653+00:00""Attachment3InstructionsToOfferors_SectionL.pdf"326417"file"".pdf""1""2026-08-19T20:55:37.183+00:00""23560a07a95344278680fee167a09c16""public""2026-10-29T19:33:01.653+00:00""1""public""d130aafb6a3e4623b8dc6ccd159d51d2""0"51"0""2026-10-29T19:33:01.653+00:00""Attachment4EvaluationCriteria_SectionM.pdf"239488"file"".pdf""1""2026-08-19T20:55:37.183+00:00""ed7321112aa34323841c2a787cd385a4""public""2026-10-29T19:33:01.653+00:00""1""public""9390cd724786408daec3b0145162d3a0""0"48"0""2026-10-29T19:33:01.653+00:00""Attachment5_AllCDRLs_and_DIDs.pdf"1698887"file"".pdf""1""2026-08-19T20:55:37.183+00:00""721d36c0891a4ecab1ff838a638835fc""private""0""controlled""c1f82847520c48eaa4f0c70e957628db""1"45"0""Attachment6_C5NLG_OuterCylinder1620004035249Portfolio.pdf"79107858"file"".pdf""1""2026-08-19T20:55:37.183+00:00""6361c88479a847d1b4ff56e92e410a45""private""0""controlled""55e9f4805c9a40a49a948efcbfc32347""1"42"0""Attachment7_F16MLG_OuterPistonAssembly1620014420167Portfolio.pdf"30890590"file"".pdf""1""2026-08-19T20:55:37.183+00:00""06542f3ca57d4e738adb2f7ad7e3f9ed""private""0""controlled""ba8f596f3db447a5807354b22e5a8d0e""1"39"0""Attachment8_417GUEA_Checklist.pdf"63980"file"".pdf""1""2026-08-19T20:55:37.183+00:00""c3bf7346140f490b9d8ed1b803b410a1""public""0""public""83dd9c7be5e04f43a6797aff83f2ca53""0"36"0""Attachment9LandingGearRequirementsDocument_LGRD.pdf"351018"file"".pdf""1""2026-08-19T20:55:37.183+00:00""6c7aba0eaad0411c94f282d5bbb2a7cb""public""0""public""edee06b2797f4e3fac41843a5862cb97""0"33"0""Attachment10LGCSCI2BidsetAgreement.pdf"143704"file"".pdf""1""2026-08-19T20:55:37.183+00:00""f368672bf77247338bd03af1514e7185""public""0""public""8480f66976304466b42b06a20759f053""0"30"0""Attachment11PastPerformanceClientAuthLtr.docx"27852"file"".docx""1""2026-08-19T20:55:37.183+00:00""d39414c7e19943db91226cb8f8da06de""public""0""public""4956fff0d4374c99bf0bc1ead1556599""0"27"0""Attachment12PastPerformanceConsentLetter.docx"33950"file"".docx""1""2026-08-19T20:55:37.183+00:00""0f751f6bdaae47fb81696e5f0d9a08d2""public""0""public""83eb45f46e1d4f8f846effbb84862420""0"24"0""Attachment13PastPerformanceInformationSheet.docx"39794"file"".docx""1""2026-08-19T20:55:37.183+00:00""59aa166722514f729b8e52e36f5f282c""public""0""public""5a4ccb6055a34ae7ba18b3de9091f2e8""0"21"0""Attachment14PastPerformanceQuestionnaire.docx"39799"file"".docx""1""2026-08-19T20:55:37.183+00:00""697c26efb798469794b3bcf99b0264ea""public""0""public""7084f64d74e54d57a9236b21e7d6984e""0"18"0""Attachment15QualityAndPackagingMatrix.xlsx"872620"file"".xlsx""1""2026-08-19T20:55:37.183+00:00""dbb7f2fc1f7e4d01b6313a7b01d6d593""private""0""controlled""4224e4b6941a41a690c0161ca56be3f4""1"15"0""Attachment16CERTIFICATE_OF_DESTRUCTION_OR_RETURN.pdf"75730"file"".pdf""1""2026-08-19T20:55:37.183+00:00""8961b91345ca4229a82924e8f16f52c7""public""0""public""165006b2bd454fa88aa4006c0471186e""0"12"0""Attachment17CERTIFICATION_FOR_THE_USE_OF_BOEING_TECHNICAL_DATA.pdf"48123"file"".pdf""1""2026-08-19T20:55:37.183+00:00""cd2971e1533846628f3ca645e8a55cb4""public""0""public""220a8828edd844b2958f80db84a6ffbb""0"9"0""Attachment18Team_Roles_and_Responsibilities.xlsx"21803"file"".xlsx""1""2026-08-19T20:55:37.183+00:00""da770c35aafe476b97ae95b7f0741a49""public""0""public""c7a34d5706324be6894c25e2a5abf7ee""0"6"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9d33363c35224829b616a1eef9ecb1e1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.