INVITATION TO BID
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
**Project Description: Pad for new well, Drill new 8-inch diameter well to approximately 550-feet below ground surface, Well Manhole, 6-inch pipes, valves, fittings, and appurtenances from new well to connect to existing 6-inch diameter water main. Meter Manhole with pipes, fittings, valves and appurtenances.
Contractor to review Spec section 1.12 for Permits and inspections required to be provided by Contractor**
Construction Cost Estimate: $370,000.00
We post new excavating opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Utah (Bonfire) (solicitation 256109), retrieved via the Utah Bonfire procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.