GRAY WALL LIVESTOCK WATER WELL
The contractor will drill a livestock water well expected to be 150 feet into the Sundance Formation, using a minimum 9.5-inch bit. Work includes installing contractor-furnished 5-inch PVC casing (135 linear feet), 5-inch well screen (20 linear feet), formation stabilizer (125 linear feet), gravel packing with .020 silica sand (20 linear feet), and an 8-inch steel protective casing (5 linear feet). The contractor must also perform well development and disinfection (3 hours), well testing to determine approximate yield (2 hours), and mobilization. All work must comply with the State of Wyoming Water Well Minimum Construction Standards and be performed by a licensed well driller. The contractor is responsible for furnishing all materials, including certified ASTM, API, NSF, or AWWA casing. The place of performance is Natrona County, Wyoming.
We post new excavating opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80225""DENVER""CO""USA""DENVER FEDERAL CENTER BLDG 85""PO BOX 25047""Sol_140L0626Q0015_Amd_0001.pdf"207123"file"".pdf""1""2026-09-25T20:00:11.579+00:00""9227c45daa6d4db3b21691713ebd0fd9""public""0""public""c6c1ba24e0bf42ed93204bf588ba2557""0"7"0""Sol_140L0626Q0015.pdf"682669"file"".pdf""1""2026-08-25T01:39:32.541+00:00""bfb459b81bd043bd9cc7b5998cc84d1e""public""0""public""393f960294d543fbba1938aba3a27c59""0"6"0""MFR_Synopsis_Exemption.pdf"125893"file"".pdf""1""2026-08-25T01:39:32.541+00:00""bc621d452e2e4a6894f1a499135b063e""public""0""public""382aa19fc710431e9b2b2c49a90f170d""0"5"0""Attachment_3_Quote_Schedule.pdf"128382"file"".pdf""1""2026-08-25T01:39:32.541+00:00""bfb4b4ec99714d34a2fd95e266045e21""public""0""public""31218b42ed8d4b68a2affc07f88ed737""0"4"0""Attachment_4_RFI_Form.xlsx"11391"file"".xlsx""1""2026-08-25T01:39:32.541+00:00""30aa68d7d4f64f5b874d2e276b40bb8f""public""0""public""4d02c920381c48d49209380f3bbf3365""0"3"0""Attachment_2_DOL_Wage_Determination_WY_20260043.pdf"78522"file"".pdf""1""2026-08-25T01:39:32.541+00:00""4e7634d6eed44e5499f277c59e43ae22""public""0""public""96f923e5e7b34b58a055c1d53d06d4dd""0"2"0""Attachment_1_Statement_of_Work.pdf"3592828"file"".pdf""1""2026-08-25T01:39:32.541+00:00""a68487b4558c49b58fdfc9e2a732821e""public""0""public""95a8f27c5b8944d0bbfac1944b2aa1f8""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2ea0514ec536461eb08886f90bc56400), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.