THIS PROJECT REQUIRES USING THE ELECTRONIC CERTIFIED PAYROLL PROGRAM. SEE ATTACHMENT TO NOTICE TO CONTRACTORS.
THIS IS A WORKING P&T (PRICE + TIME) PROJECT.
THE DEPARTMENT WILL NOT HOLD RETENTION ON THIS PROJECT. PER UTAH STATE CODE § 13-8-5 (1) PRIME CONTRACTORS CANNOT HOLD RETENTION. REFER TO UTAH CODE § 13-8-5 (1) FOR MORE INFORMATION.
The work includes mobilization, public information services, traffic control, installation of fiber roll, survey, removal of delineators, roadway excavation, installation of a dry well system, drainage pipe, open curb shallow catch basin, open curb inlet grate and frame, untreated base course, HMA - 1/2 inch, emulsified asphalt (tack), perpendicular/parallel pedestrian access ramps, concrete sidewalk, concrete curb and gutter type B1, and concrete driveway flared, 7 inch thick. The contract time is a range of 20 to 44 working days.
We post new asphalt opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
{"Unit":"Lump","Line No":"1","ItemName":"Mobilization","Quantity":"1.00","ItemNumber":"015017010"}{"Unit":"Ton","Line No":"13","ItemName":"HMA - 1/2 inch","Quantity":"208.00","ItemNumber":"02741705*"}{"Unit":"sq ft","Line No":"16","ItemName":"Concrete Sidewalk","Quantity":"2,783.00","ItemNumber":"027767010"}Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Utah Department of Transportation (solicitation 22677), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.