For constructing the Roadway Improvements (Left Turn Lane Addition) on SR-56 at Hearn Drive in Chatom. Length 0.352 mi.
County: Washington County, Alabama
Contract Time: 35 Working Days
Bracket Estimate: $719,317 to $879,165
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
For constructing the Roadway Improvements (Left Turn Lane Addition) on SR-56 at Hearn Drive in Chatom for 0.352 miles, including clearing and grubbing, unclassified and borrow excavation, roadbed processing, crushed aggregate base, bituminous treatment, planing existing pavement, Superpave wearing, upper binder, leveling and lower binder layers, scoring, aggregate surfacing, 18-inch roadway pipe extension, mobilization, markers, geotextile, topsoil, seeding, sodding, mulching, silt fence, hay bales, wattle, geometric controls, construction fuel, solid white and yellow, dotted and temporary striping, traffic control markings and legends, pavement markers, construction signs, drums, cones and pilot car, with a contract time of 35 Working Days.
We post new asphalt opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261106-CALL027), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.