We'll email you new general contractors opportunities in Michigan as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
472/26527.ABG; St. Louis/Oaks CFs-Capacity Realignmnt
Services cover confirming and updating programming and schematic layouts from the included study, site development, design development, final design documentation including IT design and access security furniture, fixtures, equipment and signage, and office and field construction administration for a 176-bed Level V facility at St. Louis with four 44-bed units connected via a core building and a 240-bed Level IV facility at Oaks, designed to LEED Silver without registration, with evaluation of generator backup capacity and construction outside the secured perimeter.
Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFI-171-260000000017-2), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.