472/26527.ABG; St. Louis & Oaks CFs-Capacity Realignment
The selected Professional Services Contractor (PSC) will provide professional services for the development of new housing facilities at two existing correctional facility campuses. The scope includes Phase 200 Program Analysis, Phase 300 Schematic Design, Phase 400 Preliminary Design, Phase 500 Final Design, Phase 600 Construction Administration – Office Services, and Phase 700 Construction Administration – Field Services. The PSC will be responsible for conducting detailed site investigations, advancing the design from the existing schematic design report, developing complete construction documents, assisting the Construction Manager in bidding, and providing complete construction administration services. The work must be performed at two separate locations (Oaks Correctional Facility in Manistee, MI and St. Louis Correctional Facility in St. Louis, MI) during both the design and construction periods, requiring separate, parallel design meetings and construction administration across the two geographically separated sites.
We post new general contractors opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Michigan SIGMA VSS (solicitation RFP-171-270000000167-1), retrieved via the Michigan SIGMA Vendor Self Service portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.