The Department of Game, Fish and Parks (GFP) is soliciting Statements of Interest for Administration/Design/Construction services to be performed on the owner's behalf to provide site investigations and report, hydraulic modelling, plans, specifications, cost estimates, and site inspection/testing for a fish barrier at East Vermillion Lake Dam in McCook County, SD. The consultant will be working alongside SD GFP to provide plans, specs, and information for the duration of the project.
The South Dakota Department of Game, Fish and Parks is seeking engineering consulting services to evaluate feasible, cost-effective options for preventing the upstream movement of invasive carp into East Vermillion Lake during high water events. High-water events in 2019 and 2024 resulted in partial erosion of the park entrance road where it intersects the spillway, creating a potential pathway for invasive carp to enter the lake system. Because East Vermillion Lake is connected to other significant recreational waters, including Lake Thompson, preventing the spread of invasive carp is a priority. The selected engineering consultant will assess, design, and develop specifications for potential fish deterrent systems at the East Vermillion Lake Dam.
The projects scope of work will include, but is not limited to:
• Geotechnical borings, site investigations, hydraulic modelling and fish barrier recommendations for the project.
• Design and plans preparation activities as necessary to prohibit passage of invasive carp into Lake Vermillion
• Land surveying activities.
• Hydrologic/hydraulic design activities.
• Construction inspection & survey activities.
The Consultant shall provide site investigation report, & design concepts report with cost estimates for the project by June 1st, 2027.
The chosen Consultant will be asked to provide detailed invoices showing cost breakdowns billed to specific project codes in half hour increments.
Copies of the Statement of Interest must be submitted by 5:00 PM CT on December 17th, 2026. Please send an electronic copy (media or e-mail attachment) to:
James Gilkerson, P.E.
Department of Game, Fish, and Parks
523 E Capitol
Pierre, SD 57501-3182
Phone: 605-773-4521
Email: James.Gilkerson@state.sd.us
Those firms that desire additional information specific to the project may contact James Gilkerson at (605)-773-4521 or email James.Gilkerson@state.sd.us
Invitation Only · Ready for Responses
Documents (1):
• SOI Document.pdf (607 KB)
View the full solicitation and download documents on South Dakota's posting board.
The selected engineering consultant will assess, design, and develop specifications for potential fish deterrent systems at the East Vermillion Lake Dam. The scope includes geotechnical borings, site investigations, hydraulic modelling and fish barrier recommendations; design and plans preparation activities to prohibit passage of invasive carp into Lake Vermillion; land surveying activities; hydrologic/hydraulic design activities; and construction inspection and survey activities. The consultant shall provide a site investigation report and design concepts report with cost estimates by June 1st, 2027.
We post new architecture and design opportunities in South Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Dakota work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Dakota Procurement (event 21411), retrieved via the State of South Dakota posting board (ESM Solutions). View the official posting, and always confirm requirements and deadlines with the issuing agency.