The anticipated date of selection for this agreement is 02/10/2027, with a NTP on the first work order anticipated for 03/19/2027.
The Department of Transportation will retain an engineering firm for a project specific Open-end agreement for the services indicated below:
This project will be the full reconstruction for US 30 in the area of the PA 82 interchange. This will be a full federal oversight project and schedules will need to reflect all timeframes needed for review and approval by FHWA in design and construction.
The engineering work and services that may be required under this contract includes but are not limited to:
These engineering services identified are the general work activities that can be expected under this Open-end / Project specific Agreement. A more detailed project specific Scope of Work will be outlined for each individual Work Order developed under this agreement. This project is anticipated to be a digital delivery project.
The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.
The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
All questions and answers are required to go through ECMS's "Questions and Responses" forum.
The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 5 years.
The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below.
The engineering services and environmental studies identified above are the general work activities that can be expected under this Open-end Contract. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Open-end Contract.
Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the [General Requirements](SVCOMFileCabinet?action=GETURL&FILE_NAME=Advertisement General Requirements - Non Construction Inspection Services&FILE_DATE=06/26/2026) document.
The engineering work includes field surveys, digital model preparation, utility verification, coordination and subsurface investigations, erosion control details and narrative, right-of-way plans, structure designs including type, size and location reports and structure plans, core boring layouts, foundation designs and reports, soils investigations and reports, traffic control and management plans with narratives, traffic signal and ITS plans, Section 102 and 404/105 permit materials, accident and traffic flow data collection and engineering studies, alternative analysis, construction plans, specifications and estimates, abstracts, deed searches, stormwater management and construction support services, with detailed scope outlined per work order.
We post new architecture and design opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_ADV_19423), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.