Sealing and striping bus parking lot. Cut and patch pavement for charger installation.
Construction Cost Range: 24,000 to 34,000
Documents: ADC Engineering
The work consists of sealing and striping the bus parking lot, and cutting and patching pavement for the installation of electric bus charging stations.