Valley Water is soliciting bids for localized shotcrete repairs at three separate Coyote-Alamitos Canal wall locations in and near San Jose, California. Work includes sawcutting and removing damaged shotcrete, preparing substrates, installing approximately 2,750 square feet of welded wire mesh, and placing approximately 26.6 cubic yards of 4,000-psi wet-mix shotcrete at 3 inches nominal thickness. The Contractor shall provide all labor, materials, equipment, access controls, environmental protection, cleanup, disposal, curing, documentation, and restoration necessary to complete the repairs. The canal will be dry with no canal operations during construction, and the Contractor shall install straw wattles at both ends of each work area and provide a temporary bypass if rain occurs. Access is over a 10- to 12-foot dirt maintenance road, and work may be suspended when rain makes the road or work area unsafe or impassable. The desired completion date is December 31, 2026, subject to weather and safe site conditions.
Additional Details
Department: Purchasing Services Unit #820
License Required: B or C-8
Pre-Bid Meeting: October 29, 2026 at 9:00 AM (mandatory)
Q&A Deadline: November 2, 2026 at 2:00 PM
Required Submittals: Line Items, Submittal Checklist, Bid Form, Bid Table, Bid Questionnaire, References, Non-Collusion Declaration, Disqualification Questionnaire, Request for "Or Equals", Local Business Enterprise Consideration, Small Business Outreach Program Affidavit, Conflict of Insterest Disclosure, W-9, List of Subcontractors, Bidder's Bond (Security)
Work includes sawcutting and removing damaged shotcrete, preparing substrates, installing approximately 2,750 square feet of welded wire mesh, and placing approximately 26.6 cubic yards of 4,000-psi wet-mix shotcrete at 3 inches nominal thickness. The Contractor shall provide all labor, materials, equipment, access controls, environmental protection, cleanup, disposal, curing, documentation, and restoration necessary to complete the repairs. The canal will be dry with no canal operations during construction, and the Contractor shall install straw wattles at both ends of each work area and provide a temporary bypass if rain occurs. Access is over a 10- to 12-foot dirt maintenance road, and work may be suspended when rain makes the road or work area unsafe or impassable. The desired completion date is December 31, 2026, subject to weather and safe site conditions.
We post new concrete opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Contact names and phone numbers are on the official posting.
Source: Santa Clara Valley Water District (bid 145043), retrieved via the Santa Clara Valley Water District PlanetBids portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.