Work includes rehabilitation of covered and open concrete structures; relining, modification, or replacement of small and large diameter steel and ductile iron pipes and their associated pipe supports; replacement or installation of valves and piping appurtenances and their associated electrical
Place of Performance: California
Performance Start: 4/15/2027
Work includes rehabilitation of covered and open concrete structures; relining, modification, or replacement of small and large diameter steel and ductile iron pipes and their associated pipe supports; replacement or installation of valves and piping appurtenances and their associated electrical and instrumentation scope; installation and operation of a temporary 11 MGD pumped bypass; rehabilitation of reactor mixer and aerator; installation of new or improvements to existing instrumentation and their associated electrical and instrumentation scope; rehabilitation and replacement of motor control center components; modifications to existing sluice gates and installation of new slide gates; installation of platforms and access improvements to open concrete structures; rerouting of sump pump discharge lines; excavation and trench work; and surveying of key points in and around the reactors.
We post new concrete opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Garney Pacific, Inc. (SUBNet), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.