- Items
- MOBILIZATION 1.000 LS, BONDS AND INSURANCE 1.000 LS, REMOVAL & DISPOSAL OF EXISTING PAVEMENT 685.000 SY, REMOVAL OF EXIST. GUARDRAIL 950.000 LF, UNCLASSIFIED EXCAVATION 84.000 CY, BORROW EXCAVATION 3,638.000 CY, MAINTENANCE STONE 43.000 TON, HMA SHOULDER WIDENING COURSE 11,252.853 TON, LIQUID ASPHALT BINDER PG64-22 3,987.003 TON, FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,200.000 SY, FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,100.000 SY, MILLING EXISTING ASPHALT PAVEMENT 2.0" 221,000.000 SY, MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 7,525.000 SY, ASPHALT INTERMEDIATE COURSE TYPE B 21,560.853 TON, ASPHALT SURFACE COURSE TYPE B 21,810.853 TON, ASPHALT SURFACE COURSE TYPE C 14,058.000 TON, DRIVEWAY PAVING-SURFACE TYPE C 2,775.000 TON, TRAFFIC CONTROL 1.000 LS, PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,632.000 SF, 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 46,420.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 601,685.000 LF, 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,960.000 LF, 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 6,800.000 LF, WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 140.000 EA, WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 60.000 EA, WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 8.000 EA, 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 52,380.000 LF, 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 326,590.000 LF, 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,345.000 LF, 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,280.000 LF, 6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,400.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 113,370.000 LF, 6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 61,660.000 LF, 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 590.000 LF, 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,850.000 LF, WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 35.000 EA, WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 21.000 EA, WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA, 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 15,100.000 LF, 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 95,105.000 LF, BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL 12.000 EA, BIKE LANE ARROW - PREFORMED THERMO - 60MIL 24.000 EA, PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 420.000 EA, PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 20.000 EA, PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,263.000 EA, MILLED-IN RUMBLE STRIP 19.610 MI, FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 185.000 LF, FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,230.000 LF, FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 50.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 1,280.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 50.000 LF, FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 4,645.000 LF, SAWCUT FOR LOOP DETECTOR 1,495.000 LF, F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 10.000 EA, F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 2.000 EA, DETECTABLE WARNING MATERIAL 75.000 SF, CONCRETE MEDIAN 220.000 SY, PEDESTRIAN RAMP CONSTRUCTION 150.000 SY, PREMASH W-BEAM STRONG POST SYSTEM WSP3 120.000 LF, PREMASH W-BEAM COMPRESSED SHLDR 9' POST 600.000 LF, PREMASH TYPE T TL3 LEADING 50' 4.000 EA, PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 17.520 ACRE
- Call No
- 190
- File No
- 4378280
- Dbe Goal
- 0.00%
- Funding
- ST
- Counties
- Sumter
- Project No
- P045569
- Letting Date
- 11/10/2026
- Letting Time
- 2:00 pm
- Notice Title
- 11102026 Proposal 5177470 - NTC 60 DAY AD
- Approx Length
- 16.8000
- Available Date
- Nov 6, 2026
- Categorized By
- llm
- Detail Fetched
- Yes
- Completion Date
- 8/31/2028