2027 UNION PAVEMENT IMPROVEMENT
Counties: Union
SC File No.: 4477570
Project No.: P045299
Completion Date: 6/30/2028
Funding: ST
DBE Goal: 0.00%
Approx. Length: 8.0800 miles
Letting: November 10, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, railroad insurance and flagging, selected clearing and grubbing, removal and disposal of existing pavement, removal of existing guardrail, unclassified excavation, borrow excavation, additional rock for full depth reclamation, maintenance stone, cement modified recycled base (10" and 12" uniform) with curing method B, Portland cement for cement modified recycled base course, HMA shoulder widening course, liquid asphalt binder PG64-22, full depth asphalt pavement patching (6", 8", 10", 12" uniform), milling existing asphalt pavement (1.75" and variable), asphalt intermediate course types B and C, asphalt surface course types B and C, driveway paving surface type C, asphalt surface treat (single treatment), traffic control, permanent construction signs (ground mounted), various pavement markings (fast dry paint and thermoplastic), permanent pavement markers, removal of pavement markings, milled-in rumble strips, conduit and wire installation, sawcut for loop detector, electrical enclosures, temporary adjustment of traffic signal equipment, smooth wall pipe (15", 18", 24"), cleaning existing pipe, catch basins, concrete collar, adjust catch basin, concrete sidewalk (4" uniform), detectable warning material, concrete driveway (6" uniform), pedestrian ramp construction, rip-rap (class B), geotextile for erosion control under riprap, MT3 leading end treatment TL3, MGS3CS GR compressed shoulder, reset fence, permanent grassing for non-permitted resurfacing projects, sediment tubes for ditch checks, silt fence, replace/repair silt fence, and removal of silt retained by silt fence.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261110-200), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.