I-26 EB OVER BOWEN LAKE (S. PAC RIVER) BRIDGE REPAIR
Counties: Spartanburg
SC File No.: 4276630
Project No.: P045055
Completion Date: 7/31/2027
Funding: FED
DBE Goal: 0.00%
Approx. Length: 0.4530 miles
Letting: November 10, 2026 at 2:00 pm
The work includes mobilization, bridge construction access, removal and disposal of designated portions of the existing bridge, milling existing asphalt pavement, asphalt base, intermediate, and surface courses, traffic control, barricades, permanent construction signs, truck mounted attenuators, portable terminal impact attenuators, temporary concrete barriers, pavement markings, concrete for structures, grooved surface finish, reinforcing steel for structures, concrete bridge barrier parapet, 42-inch MASH concrete barrier parapet/railing wall, compression seal joint, and resetting of leading and trailing end treatments.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261110-180), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.