This project is the construction of State Route 2003 over an unnamed tributary to Van Horne Creek in Union and Vernon Townships, Crawford County, with an approximate length of 0.057 mile from SR 2003/Segment 0120/Offset 1977 to SR 2003/Segment 0130/Offset 0183, including replacing a 72" Corrugated Metal Pipe with an 84" Reinforced Concrete Pipe, asphalt roadway reconstruction, guide rail improvements, delineation, and waterborne pavement markings, as indicated on the approved drawings included in the Bid Package.
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
The work includes replacing a 72-inch corrugated metal pipe with an 84-inch reinforced concrete pipe over an approximate length of 0.057 mile from SR 2003/Segment 0120/Offset 1977 to SR 2003/Segment 0130/Offset 0183, including asphalt roadway reconstruction, guide rail improvements, delineation, and waterborne pavement markings as indicated on the approved drawings included in the Bid Package.
We post new plumbing opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_123058_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.