Congress Avenue Bridge over SFRTA Railroad
Engineer's Estimate $862,000
The work includes roadway items such as mobilization, maintenance of traffic (including pedestrian MOT), steel sleeve removal and post hole patch repair, traffic barrier top surface repair, traffic barrier face repair, fencing (Type R, 5.1'-6.0' height, vertical), removal of existing bridge fencing, and contingency items like damaged reinforcement repair, variable message sign (non-MOT), and traffic control officer (non-MOT).
We post new structural work opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Engineering and Public Works (solicitation IFB-360-2021610-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.