The principal items of work and approximate quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24, 628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
The principal items of work include: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack (2 EACH), Compost Filter Sock 32” Diameter (5,912 L.F.), Weighted Sediment Filter Tube (351 L.F.); Clearing and Grubbing (23.4 ACRE); Grading – Grading (122,489 C.Y.), Grading – Ripping (14.4 ACRE); Planting – Planting Preparation (23.4 ACRE), Tree Seedlings (9,790 EACH), Grass Seed (713 LB.); Subsurface Drain (4,520 L.F.); Chimney/Blanket Drain – AASHTO No. 8 Aggregate (270 TON), R-4 Rock (104 S.Y.), Filter Fabric (312 S.Y.); Permanent Channel Excavation (1,626 C.Y.); Erosion Matting (4,642 S.Y.); Stilling Basin (231 S.F.); Coal Refuse Disposal (44,073 C.Y.); Coal Ash Addition – Supply and Delivery (24,628 TON), Coordination (1 L.S.), Placement (24,628 TON); Access Road – Construction (1 L.S.), Maintenance Stone (100 TON); Construction Surveying, Type A (1 L.S.).
We post new excavating opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: PA eMarketplace (solicitation OSM 11,65(0948,4371)101.1), retrieved via the Pennsylvania eMarketplace statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.