The principal items of work and approximate quantities are:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter
Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
MANDATORY PRE-BID CONFERENCE is scheduled Via Teams on Wednesday, October 28, 2026, at 2:00 PM. A link to the Teams meeting has been included in the Final Bid Information available on Bid Express.
FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
Principal items include preparation and implementation of an Erosion and Sediment Pollution Control Plan; clearing and grubbing; trench excavation (2,575 C.Y.); installation of 8-inch perforated PVC SDR-35 pipe (1,088 L.F.), 8-inch solid PVC SDR-35 pipe (78 L.F.), AASHTO No. 1 coarse aggregate (3,680 C.Y.), and AASHTO No. 57 coarse aggregate (173 C.Y.); precast concrete inlet (1 each) and manhole (1 each); segmented retaining wall with geogrid reinforcement (3,150 S.F.) and associated 8-inch perforated PVC SDR-35 pipe (898 L.F.); concrete patio replacement (250 S.Y.); and site restoration including seeding, topsoil (20 TON), and miscellaneous work.
We post new concrete opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: PA eMarketplace (solicitation OSM 02(1454)102.1), retrieved via the Pennsylvania eMarketplace statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.