BID 2026-65 Bear Creek Culvert and Molalla Ave Shoulders Project
The work includes replacing the existing culvert with a 3-sided precast concrete structure to improve hydraulic capacity, widening roadway shoulders, constructing a new pump station with two submersible sewage pumps, precast concrete wet well, discharge piping, valves, concrete masonry block building, HVAC systems, new meter main electrical power service, new diesel backup generator, automatic transfer switch, motor controls, lighting panel, PLC control panel and SCADA, instrumentation, site work including earthwork, grading, excavation, backfill, drainage, gravity block retaining wall, AC paving, fences and gates, cast in place concrete slabs, new gravity sewer and new manholes, new force main, demolition of existing pump station, capping and/or removal of abandoned portions of existing sanitary sewers and force main, and other miscellaneous site improvements.
We post new plumbing opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: OregonBuys (bid S-C01010-00018004), retrieved via the OregonBuys statewide open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.